Skip to main content

Facility Quick Facts 2021

Building

Total Campus

Main Campus 

Off Campus/Leased

GSF (1)

16,360,744

14,984,762

 1,375,982 

State Supported GSF 

9,843,748

8,515,105

1,328,643

Non-State GSF

6,516,996 

6,469,657

47,339 

NASF (2) 

9,324,875

8,175,484

1,149,391 

No. of Buildings         

456 (Includes Leased)

252

174   /   30 

Average Age

48

50

46

Facility Quality Index (FQI) (4) 

GSF (5) 

Percent of GSF

 No. of Buildings

Normal Maintenance (0 - 5%) 

38,855,685

24%

42

Limited to Moderate Renovation (6 - 29%)

3,516,291

22%

66

Moderate to Extensive Renovation 

170,659 

1%

2

(30 - 49%) Comprehensive Modernization

8,451,237 

53%

316

(50 - 99%) Demolish, Replace or 

0

0%

0

Downgrade Use (100%) Total

16,023,755 

100%

426 (Excludes Leased)

Age of Facilities - UMD Own (6) 

GSF 

Percent of GSF

No. of Buildings

Greater than 115 years 

33,705 

0.21% 

115 - 86 years 

578,767 

3.61% 

39 

85 - 76 years 

758,214 

4.73% 

20 

75 - 66 years 

2,011,201 

12.55% 

59 

65 - 56 years 

2,676,207 

16.70% 

50 

55 - 46 years 

2,232,199 

13.93% 

45 

45 - 36 years 

445,374 

2.78% 

24 

35 - 26 years 

2,176,287 

13.58% 

93 

25 - 16 years 

3,270,681 

20.41% 

62 

15 - 6 years 

1,001,328 

6.25% 

18 

5 - 1 years 

839,792 

5.24% 

11 

Total 

16,023,755 

100% 

426

Renovation Needs of State Supported Facilities 

Main Campus

(3) Building Renewal Needs 

$.702B 

Infrastructure Renewal Needs 

$.284B

Sub-total Renewal Needs 

$.935B 

Building Programmatic and Modernization 

$1.249B 

Needs Total Renovation Needs 

$2.184B

Main Campus

1,347

Off Campus

3,813

Total

5,160

Botanical Assets Inventoried (7)

15,030

Miles of Roads

20

Miles of Sidewalks

87

(1) GSF (Gross Square Footage) โ€ All space in a building based on exterior dimensions (2) NASF (Net Assignable Square Footage) โ€ Space in buildings assigned to or available to an occupant 

(3) Main Campus, cost in 2017 dollars.  Infrastructure includes exterior facilities such as utilities, roads, sidewalks, and equipment in utility buildings.

(4) FQI โ€ Renovation Cost/Current Replacement Value 

(5) Totals exclude Leased Facilities 

(6) Age based on original construction date 

(7) Landscape trees and specimen shrubs (shrub layer tracking still in progress) 

Back to Top