Skip to main content

Facility Quick Facts 2023

Building

Total Campus

Main Campus 

Off Campus/Leased

GSF (1)

16,505,065

15,263,803

1,241,262

State Supported GSF 

9,631,183

8,468,641

1,162,542

Non-State GSF

6,873,882

6,795,162

78,720 

NASF (2) 

9,308,487

8,297,654

1,010,833

No. of Buildings         

451

247

177   /   27 

Average Age

50

52

48

Facility Quality Index (FQI) (4) 

GSF (5) 

Percent of GSF

 No. of Buildings

Normal Maintenance (0 - 5%) 

3,367,290

20.8%

43

Limited to Moderate Renovation (6 - 29%)

3,374,766

20.8%

53

Moderate to Extensive Renovation (30 - 49%)

408,898

2.53%

53

Comprehensive Modernization (50 - 99%)

9,040,284

55.83%

326

Downgrade Use (100%)

0

0%

0

Total

16,191,238

0%

0

Age of Facilities - UMD Own (6) 

GSF 

Percent of GSF

No. of Buildings

Greater than 115 years 

32,510

0.2% 

115 - 86 years 

765,390

4.7% 

46

85 - 76 years 

687,624

4.3% 

20 

75 - 66 years 

2,931,654

18.1% 

65

65 - 56 years 

2,158,746

13.3% 

49

55 - 46 years 

1,811,310

11.2% 

27

45 - 36 years 

975,906

6% 

37 

35 - 26 years 

2,445,706 

15.1% 

102 

25 - 16 years 

2,466,768

15.2% 

40 

15 - 6 years 

1,366,195

8.4% 

21 

5 - 1 years 

549,284

3.4% 

12

Total 

16,191,238

100% 

424

Renovation Needs of State Supported Facilities (3)

Main Campus

Building Renewal Needs 

$1.025B

Infrastructure Renewal Needs 

$0.284B

Sub-total Renewal Needs 

$1.309B

Building Programmatic and Modernization 

$1.823B

Needs Total Renovation Needs 

$3.132B

Acreage

Main Campus

1,347

Off Campus

4,813

Total

6,160

Other

Botanical Assets Inventoried (7)

16,976

Miles of Sidewalks

87

Miles of Roads

20

(1) GSF (Gross Square Footage) โ€ All space in a building based on exterior dimensions (2) NASF (Net Assignable Square Footage) โ€ Space in buildings assigned to or available to an occupant 

(3) Main Campus, cost in 2017 dollars.  Infrastructure includes exterior facilities such as utilities, roads, sidewalks, and equipment in utility buildings.

(4) FQI โ€ Renovation Cost/Current Replacement Value 

(5) Totals exclude Leased Facilities 

(6) Age based on original construction date 

(7) Landscape trees and specimen shrubs (shrub layer tracking still in progress) 