| Location | Area | Start | Finish | Repair Type | Repair Description | Service Impact Type | Contact Person | Contact Phone |
|
|---|---|---|---|---|---|---|---|---|---|
| Jimenez Hall, Electrical Outage | Entire Building. | 12-13-2025 10:00 am | 12-13-2025 12:00 pm | Electrical Ouage | To progress construction related to the Purple Line project on campus. | Planned | Chris Ho | 301-405-9969 | |
| Ritchie Coliseum, Electrical Outage | Entire Building. | 12-13-2025 8:00 am | 12-13-2025 10:00 am | Electrical Ouage | To progress construction related to the Purple Line project on campus. | Planned | Chris Ho | 301-405-9969 | |
| Central Animal Resources Facility, HVAC Systems Outage | Entire Building. | 12-08-2025 6:00 am | 12-12-2025 2:00 pm | HVAC Systems Outage | Install heat recovery coils and related equipment inside the building's air handler unit that controls heating and A/C. | Planned | James Trythall | 301-405-3463 | |
| Reckord Armory Building, Electrical Outage | Entire Building. | 12-05-2025 9:00 pm | 12-05-2025 11:00 pm | Electrical Outage | To perform tests on emergency lighting in the building, specifically in the gymnasium. | Planned | Ken Jester | 301-405-7825 | |
| Parren J. Mitchell Art-Sociology Building, HVAC Heating Hot Water Outage | Suite #1211, Library #2213 ONLY; the rest of the building will not be impacted. | 12-05-2025 6:00 am | 12-05-2025 12:00 pm | HVAC Heating Hot Water Outage | To replace two faulty heating hot water system valves. | Planned | Elber Coreas | 240-750-8850 | |
| Manufacturing Building, Fire Alarm/Suppression Testing and Inspection | Entire Building. | 12-05-2025 6:00 am | 12-05-2025 3:00 pm | Fire Alarm/Suppression Testing and Inspection | Fire Alarm and Suppression Testing and Inspection | Planned | Clarence Brown | 301-405-0134 | |
| Parren J. Mitchell Art-Sociology Building, Fire Alarm/Suppression Testing and Inspection | Entire Building. | 12-04-2025 6:00 am | 12-04-2025 3:00 pm | Fire Alarm/Suppression Testing and Inspection | Fire Alarm and Suppression Testing and Inspection | Planned | Clarence Brown | 301-405-0134 | |
| Clarice Smith Performing Arts Center, Fire Alarm/Suppression Testing | Entire Building | 12-01-2025 6:00 am | 12-03-2025 3:00 pm | Fire Alarm/Suppression Testing and Inspection | Fire Alarm and Suppression Testing and Inspection | Clarence Brown | 301-405-0134 | ||
| Multiple Buildings Sidewalk Closure | Brendan Iribe & Computer Science Instructional Center | 11-28-2025 7:00 am | 12-05-2025 5:00 pm | Exterior Sidewalk Closure | Repair Brick Inlay | Planned | Charles Patterson | 3017895078 | |
| Jimenez Hall, Exterior Painting | east, west, and north sides of Jimenez Hall | 11-26-2025 8:00 am | 12-08-2025 4:00 pm | Exterior painting | contractor will scrape, sand, prime, and put a top coat on 16 exterior doors as shown on the map. | Planned | Rolando Mendez | 301-852-1308 | |
| Parren J. Mitchell Art-Sociology Building, HVAC Chilled Water Outage | Entire Building. | 11-24-2025 6:00 am | 12-05-2025 4:00 pm | HVAC Chilled Water Outage | To replace faulty chill water isolation valves in the sociology side of the building. | Planned | Elber Coreas | 240-750-8850 |
| Location | Area | Start | Finish | Repair Type | Repair Description | Service Impact Type | Contact Person | Contact Phone |
|
|---|---|---|---|---|---|---|---|---|---|
| Biology-Psychology Parking Lot Closure | Parkin g Lot | 12-04-2025 5:00 am | 12-04-2025 4:00 pm | Parking Lot Closure | Equipment disposa; | Planned | Bill Schmelyun | 3017086147 | |
| South Hill - Exterior Charles Hall, Sidewalk Closure | Area of South Hill north of Charles Hall | 12-01-2025 8:00 am | 12-08-2025 5:00 pm | Sidewalk Closure | Emergency repairs for a leak on an underground hot water line in this area. | Planned | Randolph Bayer | 301-356-7812 | |
| Purple Line Construction Track Inspections & Geometric Testing | College Park Metro parking garage and Adelphi Road | 11-24-2025 4:00 am | 12-05-2025 8:00 am | Purple Line Construction | Purple Line Construction | Planned | Casey Ferraro | 301-405-9168 | |
| Purple Line Construction Campus Drive - Lane Closures | Campus Drive between Rossborough Lane (near the Leonardtown Apartments) and the College Park Metro parking garage | 11-15-2025 7:00 am | 12-08-2025 7:00 pm | Purple Line Construction | Purple Line Construction | Planned | Casey Ferraro | 301-405-9168 | |
| Purple Line Construction | University Boulevard between Temple Street and Adelphi Road (near Graduate Hills Apartments) • Adelphi Road between Tulane Drive and University Boulevard (near Graduate Hills Apartments and UMGC) • Campus Drive between Adelphi Road and Presidential | 11-01-2025 7:00 am | 01-26-2026 12:00 pm | Purple Line Construction | Purple Line Construction | Planned | Casey Ferraro | 301-405-9168 | |
| Industrial Lane - Parking Lot/Space Closure, Sidewalk Closure, Roadway Closure | Industrial Lane, between ANSC #142 and Chem-Nuc #090 | 10-28-2025 6:00 am | 12-12-2025 5:00 pm | Sidewalk Closure, Roadway Closure, Parking Lot Closure, Parking Space Closure | To install new underground condensate piping underneath Industrial Lane as part of the NextGen energy improvement projects. | Planned | Chrysanthe Broikos | 301-956-6155 | |
| Purple Line Construction Rossborough Lane – Periodic Lane Closures | Rossborough Lane | 09-22-2025 7:00 am | 12-22-2025 5:00 am | Purple Line | Purple Line Construction | Planned | Casey Ferraro | 3014059168 | |
| Purple Line Construction Campus Drive | Periodic Lane Closures – Core of Campus | 09-15-2025 7:00 am | 12-22-2025 5:00 pm | Purple Line Construction | Purple Line Construction | Planned | Casey Ferraro | 301-405-9168 | |
| Parking Lot #GG1 - Partial Parking Lot Closure, Sidewalk Closure | East side of the A.V. Williams Building | 08-01-2025 5:00 am | 04-15-2026 5:00 pm | Partial Parking Lot, Sidewalk Closure | To install the new cooling tower north of the electric pad at the #GG1 parking lot. | Planned | Tim Zhao | 240-383-2431 |
| Location | Area | Start | Finish | Repair Type | Repair Description | Service Impact Type | Contact Person | Contact Phone |
|
|---|---|---|---|---|---|---|---|---|---|
| Centreville Hall #098 | Elevator Car #4 | 09-05-2025 12:03 pm | Elevator Repairs | Modernization of Elevator #4 | Planned | Shane Kogok | 301-405-2222 | ||
| Prince Frederick Hall #425 | Elevator Car #5 | 01-31-2025 2:37 pm | Flood water damage | Water flood damage | Emergency | Shane Kogok | 443-758-7260 |