| Location | Area | Start | Finish | Repair Type | Repair Description | Service Impact Type | Contact Person | Contact Phone |
|
|---|---|---|---|---|---|---|---|---|---|
| Benjamin Building - HVAC Systems Outage, HVAC Heating Hot Water Outage, HVAC Chill Water Outage | Entire Building | 02-27-2026 5:00 pm | 02-28-2026 5:00 pm | HVAC Systems Outage, HVAC Heating Hot Water Outage, HVAC Chill Water Outage | HVAC dual temp piping in mechanical room 0102. | Planned | Michael Dickman | 301-458-1877 | |
| Annapolis Hall, Test and Inspection of the Fire Alarm / Suppression System | Entire Building | 02-27-2026 6:00 am | 02-27-2026 3:00 pm | Fire Alarm/Suppression Testing and Inspection | Fire Alarm and Suppression Testing and Inspection | Planned | Clarence Brown | 301-405-0134 | |
| Hornbake Library, Fire Alarm and Suppression Testing and Inspection | Entire Building | 02-23-2026 6:00 am | 02-25-2026 3:00 pm | Fire Alarm/Suppression Testing and Inspection | Fire Alarm and Suppression Testing and Inspection | Planned | Clarence Brown | (301) 405-0134 | |
| Fraternity Row, Leonardtown Community, Ritchie Coliseum - HVAC Steam Outage | Fraternity Row Houses 1 through 14, Leonardtown Community Center, Leonardtown Buildings 238 through 249, Ritchie Coliseum | 02-21-2026 3:00 am | 02-21-2026 8:00 pm | HVAC Steam Outage | To replace a steam valve in a manhole located in Lot J2. | Planned | Randolph Bayer | 301-356-7812 | |
| Jimenez Hall, HVAC Heating Hot Water Outage | Wing 1 of the Building. | 02-20-2026 6:00 am | 02-20-2026 2:30 pm | HVAC Heating Hot Water Outage | To fix a damaged piece of HVAC equipment that is causing colder temperatures to occur in this area of the building. | Planned | Alonzo Banks | 301-395-2303 | |
| Atlantic building, Physical Sciences Complex: Fire Alarm and Suppression Testing and Inspection, | Entire Building | 02-16-2026 6:00 am | 02-20-2026 3:00 pm | Fire Alarm and Suppression Testing and Inspection | Fire Alarm and Suppression Testing and Inspection | Planned | Clarence Brown | 301-405-0134 | |
| Urgent Outage: Reckord Armory, HVAC Heating Outage | Basement ROTC Offices, *ONLY* | 01-28-2026 12:40 pm | HVAC Heating Outage | Due to repairs needed on a damaged HVAC heating component. | Emergency | Gerald Young | 301-405-2222 |
| Location | Area | Start | Finish | Repair Type | Repair Description | Service Impact Type | Contact Person | Contact Phone |
|
|---|---|---|---|---|---|---|---|---|---|
| Diamondback Drive, Periodic Roadway Closure | Between Rossborough Lane and Hotel Drive: First 30-minute Closure Start: 9:30 a.m., Second 30-minute Closure Start: 2:00 p.m. | 02-25-2026 9:30 am | 02-25-2026 2:30 pm | Periodic Roadway Closure | For the setup and rigging operations for a crane at the Central Energy Plant. | Planned | Antonio Sanchez | 225-454-2185 | |
| Lot J1, Partial Parking Lot Closure | *See attached Map* | 02-24-2026 6:00 am | 02-26-2026 5:00 pm | Partial Parking Lot Closure | For the setup and rigging operations for a crane at the Central Energy Plant. | Planned | Antonio Sanchez | 225-454-2185 | |
| Purple Line: University Boulevard & Campus Drive Sidewalk Closures | University Boulevard between Tulane Drive and Campus Drive, Campus Drive between University Boulevard and Adelphi Road, Campus Drive between Ehrensberger Drive and Presidential Dr | 02-23-2026 7:00 am | 02-27-2026 5:00 pm | Exterior Sidewalk Closure | Purple Line Construction | Planned | Casey Ferraro | 301.405.9168 | |
| Parking Lot J2, Partial Parking Closure | Area of Lot J2 behind Ritchie Coliseum (see attached map) | 02-19-2026 12:00 am | 02-27-2026 11:59 pm | Partial Parking Lot Closure | To replace a steam valve in a manhole located in Lot J2. | Planned | Randolph Bayer | 301-356-7812 | |
| C. Daniel Mote, Jr., Engineering Laboratory Building - Northeast Entrance Door Closure | Northeast Entrance Door Closure | 02-18-2026 6:00 am | 04-10-2026 6:00 pm | Northeast Entrance Door Closure | To support the Zupnik Hall Project to allow for installation of Bio-pond and new sidewalk | Planned | Daniel Klenner | 240-882-5052 | |
| Exterior West - Van Munching Hall, Partial Sidewalk Closure | Portion of sidewalk along Mowatt Lane. | 01-29-2026 9:49 pm | Partial Sidewalk Closure | Repairing a leak on an underground heating hot water line that serves Van Munching Hall and the Architecture Building. | Emergency | Randolph Bayer | 301-356-7812 | ||
| Parking Lot #Z, Partial Parking Lot Closure | Southeast corner of the parking lot. | 12-22-2025 7:00 am | 09-01-2028 4:00 pm | Partial Parking Lot Closure | To facilitate the construction laydown area for the Health and Human Sciences Complex project. | Planned | Randall Phillips | 443-500-2356 | |
| Parking Lot #GG1 - Partial Parking Lot Closure, Sidewalk Closure | East side of the A.V. Williams Building | 08-01-2025 5:00 am | 04-15-2026 5:00 pm | Partial Parking Lot, Sidewalk Closure | To install the new cooling tower north of the electric pad at the #GG1 parking lot. | Planned | Tim Zhao | 240-383-2431 |
| Location | Area | Start | Finish | Repair Type | Repair Description | Service Impact Type | Contact Person | Contact Phone |
|
|---|---|---|---|---|---|---|---|---|---|
| Cumberland Hall, Elevator Modernization | Elevator Car #2 | 02-03-2026 8:00 pm | Elevator modernization | Modernization of Elevator #2 | Planned | Chris O'Dea | 301-405-2222 | ||
| McKeldin Library | Elevator Car #4 | 02-03-2026 8:00 am | 04-30-2026 4:00 pm | Elevator modernization | Modernization of Elevator #4 | Planned | Chris O'Dea | 301-405-2222 | |
| Stamp Student Union #163 | Elevator Car #5 | 12-19-2025 12:15 pm | Elevator modernization | Modernization of Elevator #5 | Planned | Chris O'Dea | 301-405-2222 |