Location Area Start Finish Repair Type Repair Description Service Impact Type Contact Person Contact Phone

Plant Sciences Building - Electrical Outage Plant Sciences Building 08-22-2026 6:00 am 08-22-2026 3:00 pm Electrical Outage To safely perform the required preventive maintenance on the building's medium voltage transformer and switch Planned Jason Reardon 301-405-2222
Bioscience Research Building, Steam Outage Bioscience Research Building 08-19-2026 6:00 am 08-19-2026 2:30 pm Steam Outage repair work on steam equipment and to install power to a domestic hot water and lab hot water tank Planned Alonzo Banks 301-405-2222
Shoemaker Building, Exterior Window Cleaning Entire Exterior of Building. 08-18-2026 8:00 am 08-18-2026 4:00 pm Exterior Window Cleaning There will be a scheduled window cleaning for all exterior windows at the Shoemaker Building. Planned Makisha Thomas 301-405-2222
Eppley Recreation Center, School of Public Health Building - Steam Outage Manhole 345 (see map attached for exact location) 08-18-2026 6:00 am 08-18-2026 12:00 pm Domestic Hot Water & Steam Outage Due to a steam leak identified within manhole 345, which supports steam service to the Eppley Recreation Center and School of Public Health Building, Facilities Management and Honeywell will be performing a planned steam outage to repair the leak. Planned Horacio Torres 301-405-2222
LeFrak Hall - East Side Entrance, Entrance Closures for Concrete Repair Work LeFrak Hall - East Side Entrance 08-17-2026 7:00 am 08-26-2026 5:00 pm Entrance Closures for Concrete Repair Work To repair multiple areas of failed concrete around stairs and railings at the Portico Planned Charles Patterson 301-405-2222
Exterior Area between LeFrak Hall and Shoemaker Building, Sidewalk Closure **SEE MAP ATTACHED** 08-17-2026 7:00 am 08-18-2026 6:00 pm Sidewalk Closure To accommodate work related to the removal of the sidewalk to install a drain pipe for the LeFrak Hall playground. Planned Anthony Brown 301-405-2222
Health Center - North Exterior Side, Roof Cleaning and Partial Sidewalk Closure Health Center - North Exterior Side 08-17-2026 6:00 am 08-22-2026 3:00 pm Roof Cleaning and Partial Sidewalk Closure To accommodate lift operations to clean the slate roof shingles on the building. Planned Colin Davis 301-405-2222
Cole Student Activities Building, Electrical Outage First Floor ONLY (Jones Hill House and the Driskell Center will not be impacted)) 08-15-2026 7:00 am 08-15-2026 4:00 pm Electrical Outage To facilitate the relocation of electrical infrastructure at the Cole Student Activities Building for the Health and Human Sciences Complex construction project. Planned Randall Phillips 301-405-2222
Parren J. Mitchell Art-Sociology Building, Loading Dock Closure and Entrance Closure North side loading dock and entrance area **SEE MAP ATTACHED** 08-15-2026 7:00 am 08-16-2026 4:30 pm Loading Dock Closure, Entrance Closure To make urgent repairs on the damaged metal steps on the loading dock stairs on the north side of the Parren J. Mitchell Art-Sociology Building. Planned Frank Dudley 301-405-2222
Shoemaker Building, Exterior Power Washing Exterior north, south, west, and east facades, stairwells, and retaining walls **SEE MAP ATTACHED** 08-14-2026 8:00 am 08-15-2026 5:00 pm Exterior Power Washing A contractor will power wash the exterior north, south, west, and east facades, stairwells, and retaining walls of the Shoemaker Building. Planned Rolando Mendez 301-405-2222
Atlantic Building - Wing 3, Domestic Hot and Cold Water Outage Atlantic Building - Wing 3 08-14-2026 6:00 am 08-14-2026 10:00 am Domestic Water Outage To tie in the domestic water for new lab sinks in the first-floor space under construction Planned Jim Andrews 301-405-2222
DTP 1, Electrical Outage; Multiple Resident Halls, Domestic Hot Water Outage and Air Conditioning Outage (Impacted DRF Bldgs.) Allegany Hall, Annapolis Hall, Baltimore Hall, Calvert Hall, Cecil Hall, Charles Hall, Frederick Hall, Garrett Hall, Hartford Hall, Howard Hall, Kent Hall, Montgomery Hall, Prince George's Hall, Talbot Hall, Washington Hall 08-14-2026 6:00 am 08-14-2026 8:00 am Electrical Outage, Domestic Hot Water Outage, Air Conditioning Outage To provide the electrical supply for an installed condensate return unit at the DTP 1, there will be a planned electrical outage. As a result, this will cause a domestic hot water and air conditioning outage at the resident halls supported by DTP 1. Planned Horacio Torres 301-405-2222
Manufacturing Building, Roof and Gutter Repair Work; Parking Lot FF2 - Partial Parking Lot Closure Exterior North Side **SEE MAP ATTACHED** 08-13-2026 6:00 am 08-14-2026 3:00 pm Roof and Gutter Repair Work, Parking Lot Closure To repair the roof and gutters on the north side of the Manufacturing Building, there will be planned lift work that will also result in the closure of parking spaces in parking lot FF2 to accommodate the operations of the lift. Planned Colin Davis 301-405-2222
Chemistry Building - Wing 1, Northeast Corner Sidewalk Closure Chemistry Building - Wing 1, Northeast Corner 08-11-2026 6:00 am 08-28-2026 5:00 pm Sidewalk Closure For underground utility duct bank installation for the NextGen Energy Program. Planned Antonio Sanchez 301-405-2222
Lee Building, Exterior Painting Exterior Southwest Side 08-10-2026 8:00 am 08-14-2026 4:00 pm Exterior painting A contractor will repair, prepare, prime, and paint the fascia on the exterior southwest side of the Lee Building. Planned Rolando Mendez 301-405-2222
Jimenez Hall, Sidewalk Closure Southeast Exterior Area Sidewalk **SEE MAP ATTACHED** 08-10-2026 7:00 am 08-14-2026 4:30 pm Sidewalk Closure Facilities Management will perform a sidewalk closure on the southeast sidewalk near the south entrance of Jimenez Hall to repair and replace damaged concrete. Planned Frank Dudley 301-405-2222
H.J. Patterson Hall, Sidewalk Repairs Exterior Southeast and Southwest Sidewalks **SEE MAP ATTACHED** 08-10-2026 7:00 am 08-14-2026 4:30 pm Sidewalk Closure Contractors will repair and replace damaged sections of the concrete sidewalk on the exterior of H.J. Patterson Hall, near the southwest and southeast entrances of the building. Planned Frank Dudley 301-405-2222
Turner Hall - Exterior South, Sidewalk Installation and Basement Exterior Door Closure Turner Hall - Exterior South Sidewalk 08-10-2026 7:00 am 08-14-2026 5:00 pm Sidewalk Installation and Basement Exterior Door Closure Sidewalk Installation Planned Charles Patterson 301-405-2222
Edward St. John Learning and Teaching Center, Sidewalk Repairs and Closure Exterior Southeast and Southwest **SEE MAP ATTACHED** 08-10-2026 7:00 am 08-14-2026 4:00 pm Sidewalk Repairs, Sidewalk Closure To repair and replace damaged sections of the concrete sidewalk to eliminate a potential trip hazards Planned Frank Dudley 301-405-2222
Chemical and Nuclear Engineering Building, Interior Building Closure Men's Restroom 1122 08-10-2026 7:00 am 08-21-2026 5:00 pm Interior Building Closure Men’s restroom 1122 closure for plumbing repairs. Planned Rita Wills 301-405-2222
Animal Sciences / Agricultural Engineering Building, Interior Building Closure and Flooring Work Rooms 0501 and 0509 08-10-2026 6:00 am 08-17-2026 5:00 pm Interior Building Closure, Flooring Work To accommodate the installation of raised flooring in rooms 0501 and 0509 at the Animal Sciences / Agricultural Engineering Building, there will be an interior building closure of these two rooms. Planned Miguel Flores 301-405-2222
Manhole 231 and 217 - Multiple Buildings Impacted, Steam Outage ESJ Learning and Teaching Center, H.J. Patterson Hall, Health Center, Jimenez Hall (Wing 1), Microbiology Building, Nyumburu Cultural Center 08-09-2026 6:00 pm 08-16-2026 11:59 pm Steam Outage, Heating Hot Water Outage, Domestic Hot Water Outage To tie the newly installed steam piping along the south side of Campus Drive into the Campus Drive steam line system. Planned Chrysanthe Broikos 301-405-2222
Urgent Outage Notification: Severn Building - Electric Vehicle Charging Stations, Electrical Outage Stations Offline, Without Power: 1A, 1B, 2A, 4B, 5A, 6B, 7A, 7B, 8A, 10A, 10B, 11B, 13B, 14, 15, 16, 17, 18, 19, 20 08-05-2026 8:30 am Electrical Outage Nineteen electric vehicle charging stations are currently without power in parking lot X1 of the Severn Building. A new breaker is on order and will be installed as soon as it arrives. Unplanned Chris O'Dea 301-405-2222
Kim Engineering Building, Compressed Air Outage and Reduction All lab areas, except for the cleanroom. 08-05-2026 6:00 am 08-14-2026 5:00 pm Compressed Air Outage and Reduction To remove temporary air compressors and replace them with a permanent air compressor that supports the lab areas at the Kim Engineering Building. Planned John Cole 301-405-2222
McKeldin Library, Exterior Painting Exterior East, North and South Sides 08-03-2026 7:00 am 09-03-2026 5:00 pm Exterior painting The contractor will scrape, prime, and put a finish coat of paint on all the wooden windows, fascia, columns, bike racks, soffit, metal railings, portico, and a couple of doors. Planned Rolando Mendez 301-405-2222
Clarice Smith Performing Arts Center, Sidewalk Repair Work Exterior North, East, and South of the building. **SEE MAP ATTACHED** 08-03-2026 7:00 am 08-14-2026 5:00 pm Sidewalk Repair Work There will be planned bluestone sidewalk repair work to correct tripping hazards along the exterior north, east, and south sidewalk areas of the Clarice Smith Performing Arts Center. No impacts to building or sidewalk accessibility are expected. Planned Charles Patterson 301-405-2222
Urgent Outage Notification: Manufacturing Building, HVAC Air Conditioning Outage M1101 (Cube Farm) 07-15-2026 8:00 pm HVAC Systems Outage, HVAC Air Conditioning Facilities Management crews are working to repair the air conditioning units that provide cooling to the M1101 (Cube Farm) area of the Manufacturing Building. As a result, this area of the building currently has an air conditioning outage. Unplanned Charles Ivey 301-405-2222
Urgent Outage Notification: Manufacturing Building, HVAC Systems Outage North side, first floor of the building **SEE MAP ATTACHED** 06-25-2026 11:50 am HVAC Systems Outage An urgent HVAC systems outage that is impacting HVAC equipment responsible for HVAC air conditioning and cooling for the north side of the first floor at the Manufacturing Building. Unplanned Charles Ivey 301-405-2222
Francis Scott Key Hall, Interior Building Closure Restrooms 0108 and 0112; Dumpster in Lot W1 *SEE ATTACHED MAP* 05-26-2026 6:00 am 08-14-2026 6:00 pm Interior Building Closure To perform ADA upgrades to women's restroom 0108 and men's restroom 0112. Planned Adesanmi Fajemisin 301-405-2222
Edward St. John Learning and Teaching Center, HVAC Chilled Water Outage South and East Ground and First Floor Areas of the Wing 1 *SEE MAP ATTACHED* 05-26-2026 6:00 am 08-14-2026 6:00 pm HVAC Chilled Water Outage To perform renovation and construction work to replace all chilled water pipe insulation in these areas of the building. Planned Adesanmi Fajemisin 301-405-2222
Road Closures
Location Area Start Finish Repair Type Repair Description Service Impact Type Contact Person Contact Phone

Alumni Drive - West of Riggs Alumni Center, Bike Lane Closure Alumni Drive - West of Riggs Alumni Center 08-10-2026 6:00 am 08-17-2026 5:00 pm Bike Lane Closure Bike Lane Closure Planned Miguel Flores 301-405-2222
Stadium Drive - Eastbound Lane, Partial Lane Closure and Sidewalk Closure Stadium Drive - Eastbound Lane 08-06-2026 7:00 am 08-21-2026 4:00 pm Partial Lane Closure and Sidewalk Closure For the installation of new infrastructure and underground electrical work from existing electrical manhole 126 to the DTP/SCUB 4 Building. Planned Randall Phillips 301-405-2222
Animal Sciences / Agricultural Engineering Building , Mechanical Room Equipment Demolition Work Wings 1, 3, and 5 **SEE COPY OF NOTICE FOR DATES** 07-17-2026 6:00 am 09-16-2026 5:00 pm Mechanical Room Equipment Demolition Work As part of the NextGen Energy Project, there will be scheduled demolition of out-of-service building equipment in the mechanical rooms of Wings 1, 3, and 5 of the Animal Sciences / Agricultural Engineering Building. Planned Antonio Sanchez 301-405-2222
Campus Drive, Sidewalk and Bike Lane Closures Exterior North of H.J. Patterson Hall **SEE MAP ATTACHED FOR ALL CLOSURES, DETOURS** 06-22-2026 6:00 am 08-26-2026 6:00 pm Sidewalk Closure, Bike Lane Closure, Crosswalk Closure To replace approximately 120 feet of steam and condensate piping along the south side of Campus Drive between the northwest corner of HJ Patterson Hall and near the west side of the Edward St John Learning and Teaching Center. Planned Chrysanthe Broikos 301-405-2222
Purple Line: Campus-wide Periodic Lane and Sidewalk Closures SEE MAP - MULTIPLE LOCATIONS 06-01-2026 7:00 am 08-28-2026 5:00 pm Purple Line Construction Purple Line Construction Planned Casey Ferraro 301-405-9168
Fieldhouse Drive - Sidewalk Closure and Partial Roadway Closure; Parking Lot Z - Partial Parking Lot Closure **SEE MAP ATTACHED** 05-26-2026 7:00 am 08-21-2026 4:00 pm Sidewalk Closure, Partial Roadway Closure, Partial Parking Lot Closure To accommodate work related to the third phase of the Health and Human Sciences Complex construction project. Planned Randall Phillips 301-405-2222
Parking Lot #Z, Partial Parking Lot Closure Southeast corner of the parking lot. 12-22-2025 7:00 am 09-01-2028 4:00 pm Partial Parking Lot Closure To facilitate the construction laydown area for the Health and Human Sciences Complex project. Planned Randall Phillips 443-500-2356
Elevator
Location Area Start Finish Repair Type Repair Description Service Impact Type Contact Person Contact Phone

Cumberland Hall, Elevator Modernization Elevator Car #1 07-27-2026 1:00 pm Elevator modernization Elevator car 1 has been taken out of service at Cumberland Hall for a planned modernization upgrade of the elevator car. Planned Chris O'Dea 301-405-2222
Ellicott Hall - Elevator 3, Elevator Modernization Elevator Car 3 04-09-2026 6:00 am Elevator modernization Modernization of Elevator #3 Planned Chris O'Dea 301-405-2222