Service Impacts

Service Outages & Impacts
Location Area Start Finish Repair Type Repair Description Service Impact Type Contact Person Contact Phone

Benjamin Building - HVAC Systems Outage, HVAC Heating Hot Water Outage, HVAC Chill Water Outage Entire Building 02-27-2026 5:00 pm 02-28-2026 5:00 pm HVAC Systems Outage, HVAC Heating Hot Water Outage, HVAC Chill Water Outage HVAC dual temp piping in mechanical room 0102. Planned Michael Dickman 301-458-1877
Van Munching Hall, Fire Alarm and Suppression Testing and Inspection, February 11 - February 13 Entire Building 02-11-2026 6:00 am 02-13-2026 3:00 pm Fire Alarm/Suppression Testing and Inspection Fire Alarm/Suppression Testing and Inspection Planned Clarence Brown 301-405-0134
Severn Building, Gas Station Closure Gas Station Fill-Up Locations 02-11-2026 6:00 am 02-11-2026 6:00 pm Gas Station Closure To perform mandatory state compliance upgrades to all 3 fill-up locations at the gas station. Planned Alonzo Banks 301-395-2303
Plant Sciences Building, HVAC Heating Hot Water Outage Entire Fourth Floor of the Building. 02-10-2026 7:00 am 02-10-2026 2:00 pm HVAC Heating Hot Water Outage To fix a leaking hot water pipe in room #4148. Planned Michael Dickman 301-405-2222
Van Munching Hall, Fire Alarm and Suppression Testing and Inspection Entire Building. 02-10-2026 6:00 am 02-12-2026 3:00 pm Fire Alarm/Suppression Testing and Inspection Fire Alarm and Suppression Testing and Inspection Planned Clarence Brown 301-405-0134
Urgent Outage: Brendan Iribe Center, Flood/Leak Response - Interior Building Closure Floors Sixth through Fourth, West Side: 5104, 5109, 5116, 5119, 5120, 5124, 5126, 5128, 5130, 5148, 5150, 5152, 5156, 5202, 5204, 4116, 4120 01-29-2026 2:50 pm Flood Response Flood from a burst sprinkler line, impacting multiple areas, mostly centered around the fifth floor west side of the building and the freight elevator throughout the building. Emergency Brian Trest 301-405-2222
Urgent Outage: Reckord Armory, Entrance/Building Closures Entire building, all entrances. 01-28-2026 8:30 pm Building/Entrance Closures Due to hazardous conditions of falling snow and ice from the roof of the building. Emergency Glynnis Bowman 301-405-2222
Urgent Outage: Reckord Armory, HVAC Heating Outage Basement ROTC Offices, *ONLY* 01-28-2026 12:40 pm HVAC Heating Outage Due to repairs needed on a damaged HVAC heating component. Emergency Gerald Young 301-405-2222
Urgent Outage: HVAC Heating Outage - Animal Sciences / Agricultural Engineering Building Wing #1, First Floor - Classrooms, and Labs (center section of Wing #1) 01-20-2026 10:45 pm HVAC Heating Service Repairs needed to a broken steam coil on air handler unit #2 Emergency Charles Ivey 301-405-2222
Road Closures
Location Area Start Finish Repair Type Repair Description Service Impact Type Contact Person Contact Phone

Purple Line Construction • Campus Drive between Preinkert Drive (near Anne Arundel Hall) and Union Drive (near the Benjamin Building) • Connector road between Lot C1 and Lot L (Lot C1 exit) • Rossborough Lane between Yale Avenue and Diamondback Drive 02-10-2026 10:00 pm 02-17-2026 6:00 am Purple Line Construction Purple Line Construction Planned Casey Ferraro 301-405-9168
Purple Line Construction west side of Baltimore Avenue at Rossborough Lane (near the Rossborough Inn and Turner Hall) 02-09-2026 7:00 am 02-13-2026 5:00 pm Purple Line Construction Purple Line Construction Planned Casey Ferraro 301-405-9168
Exterior West - Van Munching Hall, Partial Sidewalk Closure Portion of sidewalk along Mowatt Lane. 01-29-2026 9:49 pm Partial Sidewalk Closure Repairing a leak on an underground heating hot water line that serves Van Munching Hall and the Architecture Building. Emergency Randolph Bayer 301-356-7812
Parking Lot #Z, Partial Parking Lot Closure Southeast corner of the parking lot. 12-22-2025 7:00 am 09-01-2028 4:00 pm Partial Parking Lot Closure To facilitate the construction laydown area for the Health and Human Sciences Complex project. Planned Randall Phillips 443-500-2356
Purple Line Construction University Boulevard between Temple Street and Adelphi Road (near Graduate Hills Apartments) • Adelphi Road between Tulane Drive and University Boulevard (near Graduate Hills Apartments and UMGC) • Campus Drive between Adelphi Road and Presidential 11-01-2025 7:00 am 01-26-2026 12:00 pm Purple Line Construction Purple Line Construction Planned Casey Ferraro 301-405-9168
Parking Lot #GG1 - Partial Parking Lot Closure, Sidewalk Closure East side of the A.V. Williams Building 08-01-2025 5:00 am 04-15-2026 5:00 pm Partial Parking Lot, Sidewalk Closure To install the new cooling tower north of the electric pad at the #GG1 parking lot. Planned Tim Zhao 240-383-2431
Elevator
Location Area Start Finish Repair Type Repair Description Service Impact Type Contact Person Contact Phone

Cumberland Hall, Elevator Modernization Elevator Car #2 02-03-2026 8:00 pm Elevator modernization Modernization of Elevator #2 Planned Chris O'Dea 301-405-2222
McKeldin Library Elevator Car #4 02-03-2026 8:00 am 04-30-2026 4:00 pm Elevator modernization Modernization of Elevator #4 Planned Chris O'Dea 301-405-2222
Stamp Student Union #163 Elevator Car #5 12-19-2025 12:15 pm Elevator modernization Modernization of Elevator #5 Planned Chris O'Dea 301-405-2222