| Avrum Gudelsky Veterinary Center |
Entire Building |
11-03-2026 9:00 am |
11-03-2026 10:00 am |
Fire Alarm/Suppression Testing and Inspection |
Fire alarm system testing and inspection work is scheduled to occur at the Avrum Gudelsky Veterinary Center to test fire alarm devices in the laboratory areas of the building. |
Planned |
John Scali |
301-405-2222 |
|
| Benjamin Building |
Entire Building |
10-29-2026 6:00 pm |
10-29-2026 3:00 pm |
Fire Alarm/Suppression Testing and Inspection |
to perform testing of the building's fire alarm, sprinkler, and suppression systems. |
Planned |
Clarence Brown |
301-405-2222 |
|
| Reckord Armory |
Northwest, northeast, southeast, and southwest exterior corners of the building. |
10-26-2026 7:00 am |
10-30-2026 4:00 pm |
Lift Work, Roof Repair |
Lift work will be performed at the northwest, northeast, southeast, and southwest exterior corners of the Reckord Armory to replace damaged snow guards on the roof of the building. |
Planned |
Colin Davis |
301-405-2222 |
|
| Avrum Gudelsky Veterinary Center |
Entire Building |
10-24-2026 5:00 pm |
10-24-2026 10:00 pm |
Domestic Hot and Cold Water Outage |
There will be a planned domestic hot and cold water outage that will impact sinks, drinking water, toilets, showers, and lab equipment at the Avrum Gudelsky Veterinary Center in order to replace a WSSC water meter. |
Planned |
Daniel Narh |
301-405-2222 |
|
| Severn Building |
Entire Building. |
10-24-2026 7:30 am |
10-24-2026 12:00 pm |
Domestic Hot and Cold Water Outage |
There will be a planned domestic hot and cold water outage that will impact sinks, drinking water, toilets, and showers at the Severn Building in order to replace a WSSC water meter. |
Planned |
Daniel Narh |
301-405-2222 |
|
| Biology-Psychology Building |
Entire Building. |
10-23-2026 10:45 am |
|
RODI Water Outage |
There is currently an RO/DI water outage in the Biology-Psychology Building in order to perform emergency repairs to the system. |
Emergency |
Jason Lurie |
301-405-2222 |
|
| Tawes Hall |
Entire Building |
10-23-2026 6:00 am |
10-23-2026 3:00 pm |
Fire Alarm/Suppression Testing and Inspection |
Fire alarm/suppression system inspections are scheduled to occur at Tawes Hall to perform testing of the building's fire alarm, sprinkler, and suppression systems. |
Planned |
Clarence Brown |
301-405-2222 |
|
| Cambridge Community Center |
Entire Building |
10-23-2026 6:00 am |
10-23-2026 3:00 pm |
Fire Alarm/Suppression Testing and Inspection |
Fire alarm/suppression system inspections are scheduled to occur at Cambridge Community Center to perform testing of the building's fire alarm, sprinkler, and suppression systems. |
Planned |
Clarence Brown |
301-405-0134 |
|
| Cambridge Community Quad |
Bel Air Hall, south side of the building; Centreville Hall, west side of the building; Cambridge Hall, north side of the building; Cumberland Hall, east side of the building. |
10-21-2026 8:00 am |
11-20-2026 4:30 pm |
Concrete Work and Sidewalk Closures |
Planned concrete repair work will be performed on damaged areas of sidewalk throughout the Cambridge Community Quad to address trip hazards and improve structural integrity. |
Planned |
Frank Dudley |
301-405-2222 |
|
| Northgate Pedestrian Bridge |
Crossing Paint Branch stream near The Varsity **See map attached** |
10-15-2026 11:00 am |
|
Pedestrian Bridge Closure |
During annual structural inspection, it was found that increased deterioration had occurred due to micromobility vehicle use. The bridge was designed for pedestrian traffic only. |
Unplanned |
Aynsley Toews |
301-405-2222 |
|
| Shoemaker Building |
The east side entrance and the surrounding sidewalk. |
10-15-2026 8:00 am |
10-27-2026 4:00 pm |
Exterior Painting, Entrance Closure, Sidewalk Closure |
To accommodate exterior painting work and lift equipment activities to complete portico painting repairs. |
Planned |
Rolando Mendez |
301-405-2222 |
|
| Severn Building |
Entire Building. |
10-15-2026 6:00 am |
11-15-2026 5:00 pm |
Domestic Hot Water Outage |
There will be a planned domestic hot water outage for the Severn Building to replace domestic hot water equipment and components in the building. |
Planned |
William Schmelyun |
301-405-2222 |
|
| Plaza between the Wind Tunnel Building and the Computer Science Instructional Center |
Exterior Plaza |
09-25-2026 6:00 am |
04-30-2027 5:00 pm |
Plaz/Sidewalk Closure |
The plaza sidewalk area between the Wind Tunnel Building and the Computer Science Instructional Center will be closed to store equipment and materials for construction activities. |
Planned |
Randall Phillips |
301-405-2222 |
|
| Microbiology Building |
Exterior roof and surrounding sidewalk areas. |
09-21-2026 7:00 am |
10-23-2026 4:00 pm |
Lift Work, Roof Repair, Sidewalk Closure |
To accommodate lift work for roof repairs. |
Planned |
Colin Davis |
301-405-2222 |
|
| Manufacturing Building |
M1101 (Cube Farm) |
07-15-2026 8:00 pm |
|
HVAC Systems Outage, HVAC Air Conditioning |
Facilities Management crews are working to repair the air conditioning units that provide cooling to the M1101 (Cube Farm) area of the Manufacturing Building. As a result, this area of the building currently has an air conditioning outage. |
Emergency |
Charles Ivey |
301-405-2222 |
|
| Manufacturing Building |
North side, first floor of the building **See map attached** |
06-25-2026 11:50 am |
|
HVAC Systems Outage, Air Conditioning Outage |
An urgent HVAC systems outage that is impacting HVAC equipment responsible for HVAC air conditioning and cooling for the north side of the first floor at the Manufacturing Building. |
Unplanned |
Charles Ivey |
301-405-2222 |
|