Service Outages & Impacts
Location Area Start Finish Repair Type Repair Description Service Impact Type Contact Person Contact Phone

Institute for Physical Science and Technology Building, HVAC Systems Outage and Air Conditioning Outage Entire Building. 09-03-2026 6:00 pm 09-04-2026 2:00 am HVAC Systems Outage, Air Conditioning Outage To perform necessary maintenance on the air handler units that support HVAC operations in the Institute for Physical Science and Technology Building. Planned Elber Coreas 301-405-2222
Chemistry Building: Rooms 2219 and 2221 - Fire Alarm Outage; Wing 2 - Sprinkler/Suppression Outage Rooms 2219 and 2221 - Fire Alarm Outage; Wing 2 - Sprinkler/Suppression Outage **SEE NOTICE ATTACHED** 09-03-2026 6:00 am 09-03-2026 3:00 pm Fire Alarm Outage, Sprinkler/Suppression Outage To extend the existing fire alarm device and components onto the newly constructed wall in room 2221; to relocate and add new sprinkler heads to the system in rooms 2219 and 2221. Planned Cornell Jones 301-405-2222
Van Munching Hall, HVAC Systems Outage and Air Conditioning Outage Entire Building. 09-01-2026 10:00 pm 09-07-2026 5:00 am HVAC Systems Outage, Air Conditioning Outage To perform necessary maintenance on air handler units that support HVAC operations in Van Munching Hall. Planned Elber Coreas 301-405-2222
Patuxent Building, Lift Work for Roof and Guttering Cleaning - Temporary Sidewalk Closures Patuxent Building Sidewalk 08-31-2026 7:00 am 09-02-2026 2:00 pm Roof and Guttering Cleaning Roof and Guttering Cleaning Planned Colin Davis 301-405-2222
Animal Sciences / Agricultural Engineering Building Wing 3 - Loading Dock B and Driveway Closure, Wing 3 - Loading Dock B and Driveway 08-31-2026 6:00 am 09-03-2026 5:00 pm Removal of decommissioned mechanical equipment To accommodate crane operations for the removal of decommissioned mechanical equipment in the mechanical pit. Planned Antonio Sanchez 301-405-2222
Microbiology Building, HVAC Systems Outage and Reduced Air Conditioning Entire Building. 08-30-2026 6:00 pm 09-05-2026 2:00 am HVAC Systems Outage and Reduced Air Conditioning To perform necessary maintenance on air handler units that support HVAC operations in the Microbiology Building. Planned Elber Coreas 301-405-2222
Chemical and Nuclear Engineering Building, Domestic Water Outage, Steam Outage; Chemistry Building - Wings 1 and 3, Steam Outage Chemical and Nuclear Engineering Building - Entire Building; Chemistry Building - Wings 1 and 3 08-28-2026 6:00 pm 08-29-2026 6:00 pm Domestic Water Outage, Steam Outage To repair a water main break that is occurring next to a steam line in the basement mechanical room of the Chemical and Nuclear Engineering Building . **SEE ATTACHED NOTICE** Planned Daniel Narh 301-405-2222
Urgent Outage Notification: Brendan Iribe Center, HVAC Systems Outage and Air Conditioning Outage Entire Building. 08-28-2026 7:53 am 08-28-2026 10:40 am HVAC Systems Outage, Air Conditioning Outage FM crews are responding to urgent maintenance repairs needed on the chillers at the Brendan Iribe Center. The chillers are currently offline while repairs are being made, which is resulting in building air conditioning and cooling being unavailable. Emergency Paul Ramlogan, John Cole 301-405-2222
Cole Student Activities Building, Domestic Hot Water Outage Entire Building. 08-28-2026 6:00 am 08-28-2026 2:30 pm Domestic Hot Water Outage To make repairs to several leaks in the mechanical room at Cole Student Activities. Planned Alonzo Banks 301-405-2222
Hornbake Library, Steam Outage and HVAC Heating Outage Entire Building. 08-28-2026 6:00 am 08-28-2026 10:00 am Steam Outage and HVAC Heating Outage To install an isolation valve on HVAC equipment that supports Hornbake Library's steam and heating service Planned Alonzo Banks 301-405-2222
Urgent Outage Notification: Chemistry Building - Wings 2 and 3, RO/DI Water Outage Wings 2 and 3 08-27-2026 3:30 pm 08-28-2026 9:33 am RO/DI Water Outage Due to a leak in the RO/DI water system holding tank in Wing 3 of the Chemistry Building that needs to be repaired; Wing 3 fills Wing 2's RO/DI Water System. Unplanned Walter Gordon 301-405-2222
Hornbake Library - Fourth Floor on North and South Sides, HVAC Heating Hot Water Outage Fourth Floor on North and South Sides 08-24-2026 6:00 am 09-29-2026 3:30 pm HVAC Heating Hot Water Outage To perform upgrades to the HVAC components. Planned James Trythall 301-405-2222
Exterior between Leonardtown Buildings 248 and 249, Emergency Excavation Work **SEE MAP ATTACHED** 08-19-2026 8:00 am Emergency Excavation Work Facilities Management crews are responding to an urgent domestic hot water leak occurring in front of Leonardtown Building 249, which will require emergency excavation work to isolate and repair the leak. Emergency Horacio Torres 301-405-2222
Chemistry Building - Wing 1, Northeast Corner Sidewalk Closure Chemistry Building - Wing 1, Northeast Corner 08-11-2026 6:00 am 08-28-2026 5:00 pm Sidewalk Closure For underground utility duct bank installation for the NextGen Energy Program. Planned Antonio Sanchez 301-405-2222
Chemical and Nuclear Engineering Building, Interior Building Closure Men's Restroom 1122 08-10-2026 7:00 am 08-31-2026 6:00 am Interior Building Closure Men’s restroom 1122 closure for plumbing repairs. Planned Rita Wills 301-405-2222
Turner Hall - Exterior South, Sidewalk Installation and Basement Exterior Door Closure Turner Hall - Exterior South Sidewalk 08-10-2026 7:00 am 08-14-2026 5:00 pm Sidewalk Installation and Basement Exterior Door Closure Sidewalk Installation Planned Charles Patterson 301-405-2222
McKeldin Library, Exterior Painting Exterior East, North and South Sides 08-03-2026 7:00 am 09-03-2026 5:00 pm Exterior painting The contractor will scrape, prime, and put a finish coat of paint on all the wooden windows, fascia, columns, bike racks, soffit, metal railings, portico, and a couple of doors. Planned Rolando Mendez 301-405-2222
Urgent Outage Notification: Manufacturing Building, HVAC Air Conditioning Outage M1101 (Cube Farm) 07-15-2026 8:00 pm HVAC Systems Outage, HVAC Air Conditioning Facilities Management crews are working to repair the air conditioning units that provide cooling to the M1101 (Cube Farm) area of the Manufacturing Building. As a result, this area of the building currently has an air conditioning outage. Unplanned Charles Ivey 301-405-2222
Urgent Outage Notification: Manufacturing Building, HVAC Systems Outage North side, first floor of the building **SEE MAP ATTACHED** 06-25-2026 11:50 am HVAC Systems Outage An urgent HVAC systems outage that is impacting HVAC equipment responsible for HVAC air conditioning and cooling for the north side of the first floor at the Manufacturing Building. Unplanned Charles Ivey 301-405-2222
Road Closures
Location Area Start Finish Repair Type Repair Description Service Impact Type Contact Person Contact Phone

Purple Line: Campus-wide Overnight Testing Impacts **SEE ATTACHED MAP FOR IMPACTS** 08-29-2026 10:00 pm 01-26-2027 6:00 am Purple Line Construction Purple Line Construction Planned Casey Ferraro 301-405-2222
Purple Line: Campus-wide Periodic Lane and Sidewalk Closures **SEE ATTACHED MAP FOR IMPACTED ROADWAYS, SIDEWALKS** 08-29-2026 12:00 am 01-26-2027 11:00 pm Purple Line Construction Purple Line Construction Planned Casey Ferraro 301-405-2222
Animal Sciences / Agricultural Engineering Building , Mechanical Room Equipment Demolition Work Wings 1, 3, and 5 **SEE COPY OF NOTICE FOR DATES** 07-17-2026 6:00 am 09-16-2026 5:00 pm Mechanical Room Equipment Demolition Work As part of the NextGen Energy Project, there will be scheduled demolition of out-of-service building equipment in the mechanical rooms of Wings 1, 3, and 5 of the Animal Sciences / Agricultural Engineering Building. Planned Antonio Sanchez 301-405-2222
Purple Line: Campus-wide Periodic Lane and Sidewalk Closures SEE MAP - MULTIPLE LOCATIONS 06-01-2026 7:00 am 08-28-2026 5:00 pm Purple Line Construction Purple Line Construction Planned Casey Ferraro 301-405-9168
Parking Lot #Z, Partial Parking Lot Closure Southeast corner of the parking lot. 12-22-2025 7:00 am 09-01-2028 4:00 pm Partial Parking Lot Closure To facilitate the construction laydown area for the Health and Human Sciences Complex project. Planned Randall Phillips 443-500-2356
Elevator
Location Area Start Finish Repair Type Repair Description Service Impact Type Contact Person Contact Phone

Cumberland Hall, Elevator Modernization Elevator Car #1 07-27-2026 1:00 pm Elevator modernization Elevator car 1 has been taken out of service at Cumberland Hall for a planned modernization upgrade of the elevator car. Planned Chris O'Dea 301-405-2222
Ellicott Hall - Elevator 3, Elevator Modernization Elevator Car 3 04-09-2026 6:00 am Elevator modernization Modernization of Elevator #3 Planned Chris O'Dea 301-405-2222