Service Outages & Impacts
Location Area Start Finish Repair Type Repair Description Service Impact Type Contact Person Contact Phone

Benjamin Building - HVAC Systems Outage, HVAC Heating Hot Water Outage, HVAC Chill Water Outage Entire Building 02-27-2026 5:00 pm 02-28-2026 5:00 pm HVAC Systems Outage, HVAC Heating Hot Water Outage, HVAC Chill Water Outage HVAC dual temp piping in mechanical room 0102. Planned Michael Dickman 301-458-1877
Fraternity Row, Leonardtown Community, Ritchie Coliseum - HVAC Steam Outage Fraternity Row Houses 1 through 14, Leonardtown Community Center, Leonardtown Buildings 238 through 249, Ritchie Coliseum 02-21-2026 3:00 am 02-21-2026 8:00 pm HVAC Steam Outage To replace a steam valve in a manhole located in Lot J2. Planned Randolph Bayer 301-356-7812
Jimenez Hall, HVAC Heating Hot Water Outage Wing 1 of the Building. 02-20-2026 6:00 am 02-20-2026 2:30 pm HVAC Heating Hot Water Outage To fix a damaged piece of HVAC equipment that is causing colder temperatures to occur in this area of the building. Planned Alonzo Banks 301-395-2303
Paint Branch Building, Electrical Outage, February 19 Entire Building. 02-19-2026 6:00 am 02-19-2026 8:00 am Electrical Outage To install exterior lighting circuitry in the building. Planned James Andrews 443-472-6243
Plant Sciences Building, HVAC Steam Outage Entire Building. 02-19-2026 6:00 am 02-19-2026 2:30 pm HVAC Steam Outage To fix a steam leak on the roof that is impacting the lower levels of the building. Planned Alonzo Banks 301-395-2303
Kim Engineering Building, HVAC Heating Hot Water Outage Entire Building. 02-17-2026 6:00 am 02-17-2026 5:00 pm HVAC Heating Hot Water Outage To replace an air separator in the heating hot water loop in the building. Planned Elber Coreas 301-405-2222
Atlantic building, Physical Sciences Complex: Fire Alarm and Suppression Testing and Inspection, Entire Building 02-16-2026 6:00 am 02-20-2026 3:00 pm Fire Alarm and Suppression Testing and Inspection Fire Alarm and Suppression Testing and Inspection Planned Clarence Brown 301-405-0134
Urgent Outage: Reckord Armory, HVAC Heating Outage Basement ROTC Offices, *ONLY* 01-28-2026 12:40 pm HVAC Heating Outage Due to repairs needed on a damaged HVAC heating component. Emergency Gerald Young 301-405-2222
Urgent Outage: HVAC Heating Outage - Animal Sciences / Agricultural Engineering Building Wing #1, First Floor - Classrooms, and Labs (center section of Wing #1) 01-20-2026 10:45 pm HVAC Heating Service Repairs needed to a broken steam coil on air handler unit #2 Emergency Charles Ivey 301-405-2222
Road Closures
Location Area Start Finish Repair Type Repair Description Service Impact Type Contact Person Contact Phone

Parking Lot J2, Partial Parking Closure Area of Lot J2 behind Ritchie Coliseum (see attached map) 02-19-2026 12:00 am 02-27-2026 11:59 pm Partial Parking Lot Closure To replace a steam valve in a manhole located in Lot J2. Planned Randolph Bayer 301-356-7812
C. Daniel Mote, Jr., Engineering Laboratory Building - Northeast Entrance Door Closure Northeast Entrance Door Closure 02-18-2026 6:00 am 04-10-2026 6:00 pm Northeast Entrance Door Closure To support the Zupnik Hall Project to allow for installation of Bio-pond and new sidewalk Planned Daniel Klenner 240-882-5052
Purple Line Construction • Campus Drive between Preinkert Drive (near Anne Arundel Hall) and Union Drive (near the Benjamin Building) • Connector road between Lot C1 and Lot L (Lot C1 exit) • Rossborough Lane between Yale Avenue and Diamondback Drive 02-17-2026 10:00 pm 02-21-2026 6:00 am Purple Line Construction Purple Line Construction Planned Casey Ferraro 301-405-9168
Exterior West - Van Munching Hall, Partial Sidewalk Closure Portion of sidewalk along Mowatt Lane. 01-29-2026 9:49 pm Partial Sidewalk Closure Repairing a leak on an underground heating hot water line that serves Van Munching Hall and the Architecture Building. Emergency Randolph Bayer 301-356-7812
Parking Lot #Z, Partial Parking Lot Closure Southeast corner of the parking lot. 12-22-2025 7:00 am 09-01-2028 4:00 pm Partial Parking Lot Closure To facilitate the construction laydown area for the Health and Human Sciences Complex project. Planned Randall Phillips 443-500-2356
Purple Line Construction University Boulevard between Temple Street and Adelphi Road (near Graduate Hills Apartments) • Adelphi Road between Tulane Drive and University Boulevard (near Graduate Hills Apartments and UMGC) • Campus Drive between Adelphi Road and Presidential 11-01-2025 7:00 am 01-26-2026 12:00 pm Purple Line Construction Purple Line Construction Planned Casey Ferraro 301-405-9168
Parking Lot #GG1 - Partial Parking Lot Closure, Sidewalk Closure East side of the A.V. Williams Building 08-01-2025 5:00 am 04-15-2026 5:00 pm Partial Parking Lot, Sidewalk Closure To install the new cooling tower north of the electric pad at the #GG1 parking lot. Planned Tim Zhao 240-383-2431
Elevator
Location Area Start Finish Repair Type Repair Description Service Impact Type Contact Person Contact Phone

Cumberland Hall, Elevator Modernization Elevator Car #2 02-03-2026 8:00 pm Elevator modernization Modernization of Elevator #2 Planned Chris O'Dea 301-405-2222
McKeldin Library Elevator Car #4 02-03-2026 8:00 am 04-30-2026 4:00 pm Elevator modernization Modernization of Elevator #4 Planned Chris O'Dea 301-405-2222
Stamp Student Union #163 Elevator Car #5 12-19-2025 12:15 pm Elevator modernization Modernization of Elevator #5 Planned Chris O'Dea 301-405-2222