| Location | Area | Start | Finish | Repair Type | Repair Description | Service Impact Type | Contact Person | Contact Phone |
|
|---|---|---|---|---|---|---|---|---|---|
| Plant Sciences Building, Electrical Outage | Entire Building. | 01-24-2026 6:00 am | 01-24-2026 3:00 pm | Electrical Outage | To perform maintenance on the building's outside medium voltage switch and transformer. | Planned | Jason Reardon | 240-694-8431 | |
| C. Daniel Mote, Jr. Engineering Laboratory Building, Electrical Outage | Entire Building. **MARTIN HALL WILL NOT BE IMPACTED** | 01-22-2026 5:00 am | 01-22-2026 7:00 am | Electrical Outage | To install a breaker for new trash compactors in Parking Lot #E, related to the Zupnik Hall Project. | Planned | Daniel Klenner | 240-882-5052 | |
| *MULTIPLE BUILDINGS* Lift Work, Gutter/Downspout Maintenance | Tydings Hall, Francis Scott Key Hall, Woods Hall, Skinner Building | 01-21-2026 7:00 am | 01-24-2026 4:00 pm | Lift Work | To clean gutters and downspouts around each of the buildings. | Planned | Colin Davis | 301-458-1741 | |
| District Thermal Plant (DTP) #4 - *MULTIPLE BUILDINGS*, HVAC Chilled Water Outage | Physics; J.M. Patterson; Kirwan Hall; Martin Hall; Engineering Lab; Chem-Nuc Engineering; Chemistry - Wings #2, #3, #5; ANSC Building - Wings #1, #2, #3, #5; Hornbake Library; Energy Research Facility; Kim Engineering; Microbiology; Geology | 01-20-2026 6:00 am | 01-21-2026 6:00 pm | HVAC Chilled Water Outage | To allow valve installation for condensing water to the Zupnik Hall Mechanical Systems. | Planned | Daniel Klenner | 240-882-5052 | |
| Cole Student Activities Building, Steam Outage | Entire Building. **JONES HILL HOUSE WILL NOT BE IMPACTED** | 01-20-2026 6:00 am | 01-20-2026 9:00 am | Steam Outage | To replace isolation valves on the building's steam pipework and then perform further emergency repairs for a leak on a steam pipe. | Planned | Alonzo Banks | 301-395-2303 | |
| Woods Hall, Interior Building Closure | Women's restroom #0117 | 01-19-2026 7:00 am | 01-20-2026 4:00 pm | Interior Building Closure | ceramic wall tile repairs and replacement needed in this restroom. | Planned | Rita Wills | 301-852-0810 | |
| *MULTIPLE BUILDINGS* Lift Work, Gutter/Downspout Maintenance | Morrill Hall, Tydings Hall, Chincoteague Hall | 01-16-2026 7:00 am | 01-21-2026 3:00 pm | Lift Work | To clean gutters and downspouts around the building. | Planned | Colin Davis | 301-458-1741 | |
| Geology Building, Fire Alarm/Suppression Testing and Inspection | Entire Building | 01-16-2026 6:00 am | 01-16-2026 3:00 pm | Fire Alarm/Suppression Testing and Inspection | Fire Alarm and Suppression Testing and Inspection | Planned | Clarence Brown | 301-405-0134 | |
| Symons Hall - Hallways, Partial Interior Building Closure | Hallways, Entire Building. | 01-05-2026 6:00 am | 01-30-2026 4:00 pm | Partial Interior Building Closure | To facilitate the replacement of hallway lighting throughout the entire building. | Planned | Kenneth Jester | 443-716-6905 | |
| *MULTIPLE BUILDINGS* Sidewalk Closure, HVAC Chilled Water Outage | (HVAC Chilled Water - Entire Buildings; Sidewalk Closure - Entrance south of CSPAC): Clarice Smith Performing Arts Center, Riggs Alumni Center | 12-22-2025 6:00 am | 01-23-2026 6:00 pm | HVAC Chilled Water Outage | To complete the new HVAC- Chilled Water Piping system from DTP/SCUB-3 for the Clarice Smith Performing Arts Center and Riggs Alumni Center. | Planned | Al Neshati | 301-405-4454 |
| Location | Area | Start | Finish | Repair Type | Repair Description | Service Impact Type | Contact Person | Contact Phone |
|
|---|---|---|---|---|---|---|---|---|---|
| Plant Sciences Building - Loading Dock Closure, Parking Lot Closure | Behind Geology and Hornbake Library. | 01-23-2026 8:00 am | 01-23-2026 4:00 pm | Parking Lot Closure, Loading Dock Closure | To set up a large crane to load materials onto the rooftop so AT&T can upgrade the cellular antennas. | Planned | Paul Jackson | 301-405-1903 | |
| Purple Line Construction - Various Campus Lane Closures | **SEE ATTACHED MAP FOR IMPACTED ROADWAYS** | 01-21-2026 9:00 am | 01-23-2026 4:00 pm | Purple Line Construction | Purple Line Construction | Planned | Casey Ferraro | 301-405-9168 | |
| Union Lane, Partial Lane Closure | Near the southwest corner of Stamp Student Union. | 01-21-2026 6:00 am | 01-21-2026 12:00 pm | Partial Lane Closure | To unload a delivery of equipment into the Stamp Student Union. | Planned | James Andrews | 443-472-6243 | |
| Valley Drive - Ellicott Area Dining Hall, Sidewalk Closure | Near the northwest corner of Ellicott Area Dining Hall, along Valley Drive. | 01-14-2026 6:00 am | 01-23-2026 3:00 pm | Sidewalk Closure | To perform excavation work to make repairs to an underground condensate leak occurring in this area of campus. | Planned | Randolph Bayer | 301-356-7812 | |
| Purple Line Construction | Campus Drive between the Benjamin Building and Union Lane, Campus Drive between the Edward St. John Learning & Teaching Center and Symons Hall, Campus Drive between Regents Drive and the M, and Regents Drive between Campus Drive and the Clarence M. Mitche | 01-12-2026 9:00 am | 01-16-2026 4:00 pm | Purple Line Construction | Purple Line Construction | Planned | Casey Ferraro | 301-405-9168 | |
| Campus Drive, Sidewalk Closure | south side of campus drive, between H.J. Patterson Hall and Edward St. John Learning and Teaching Center | 01-12-2026 6:00 am | 01-23-2026 3:00 pm | Exterior Sidewalk Closure | To perform excavation work to make repairs to the apparent condensate leak occurring in this area. | Planned | Randolph Bayer | 301-356-7812 | |
| Washington Quad, Sidewalk Closure | South of Prince George's Hall and northeast of Baltimore Hall. | 01-06-2026 6:00 am | 01-16-2026 5:00 pm | Sidewalk Closure, Excavation Work | To perform excavation work to repair an underground hot water leak in the vicinity of Prince George's Hall and Baltimore Hall. | Planned | Randolph Bayer | 301-356-7812 | |
| Parking Lot #Z, Partial Parking Lot Closure | Southeast corner of the parking lot. | 12-22-2025 7:00 am | 09-01-2028 4:00 pm | Partial Parking Lot Closure | To facilitate the construction laydown area for the Health and Human Sciences Complex project. | Planned | Randall Phillips | 443-500-2356 | |
| Fieldhouse Drive - Partial Roadway/Lane Closure | Fieldhouse Drive and Alumni Drive near Tyser Tower, Riggs Alumni Center, Cole Student Activities Building, and DTP/SCUB-3. | 12-22-2025 6:00 am | 01-23-2026 6:00 pm | Partial Roadway Closure | To complete the new HVAC- Chilled Water Piping system from DTP/SCUB-3 for the Clarice Smith Performing Arts Center and Riggs Alumni Center. | Planned | Al Neshati | 301-405-4454 | |
| Purple Line Construction | University Boulevard between Temple Street and Adelphi Road (near Graduate Hills Apartments) • Adelphi Road between Tulane Drive and University Boulevard (near Graduate Hills Apartments and UMGC) • Campus Drive between Adelphi Road and Presidential | 11-01-2025 7:00 am | 01-26-2026 12:00 pm | Purple Line Construction | Purple Line Construction | Planned | Casey Ferraro | 301-405-9168 | |
| Parking Lot #GG1 - Partial Parking Lot Closure, Sidewalk Closure | East side of the A.V. Williams Building | 08-01-2025 5:00 am | 04-15-2026 5:00 pm | Partial Parking Lot, Sidewalk Closure | To install the new cooling tower north of the electric pad at the #GG1 parking lot. | Planned | Tim Zhao | 240-383-2431 |
| Location | Area | Start | Finish | Repair Type | Repair Description | Service Impact Type | Contact Person | Contact Phone |
|
|---|---|---|---|---|---|---|---|---|---|
| Stamp Student Union #163 | Elevator Car #5 | 12-19-2025 12:15 pm | Elevator modernization | Modernization of Elevator #5 | Planned | Chris O'Dea | 301-405-2222 | ||
| Centreville Hall #098 | Elevator Car #4 | 09-05-2025 12:03 pm | Elevator Repairs | Modernization of Elevator #4 | Planned | Shane Kogok | 301-405-2222 | ||
| Prince Frederick Hall #425 | Elevator Car #5 | 01-31-2025 2:37 pm | Flood water damage | Water flood damage | Emergency | Shane Kogok | 443-758-7260 |