Skip to main content
Facilities Management
About FM Services Projects & Programs Info & Resources FM Staff Connect
About FM
Our Team Our Units Mission, Vision, Values Strategic Priorities FAQs Recognition News FM Deep Dive Podcast Series Working for FM
Services
Capital Projects Create a New Service/Project Request Fleet Services Housekeeping Services Logistical Services Recycling & Waste Management Photography Services Renovation Projects Signs & Graphics Snow Command Center Request Service Special Services Terrapin Trader Warehouse
Projects & Programs
Arboretum and Botanical Garden Campus Facilities Plan Current Construction Map NextGen Energy Program SHIFT Student Facilities Fund Sustainability
Info & Resources
ADA Transition Plan Building Inventory Design Criteria/Facilities Standards Facilities Archival Library Facility Quick Facts Glossary of Abbreviations & Acronyms OM&U Facility Managers On-Call General Contractor Specs Service Impacts Space Use Change Form UMD Office Standards UMD Spaces
FM Staff Connect
Appreciation & Recognition Calendar Human Resources Tools & Resources Life@FM
Our Team Our Units Mission, Vision, Values Strategic Priorities FAQs Recognition News FM Deep Dive Podcast Series Working for FM
Capital Projects Create a New Service/Project Request Fleet Services Housekeeping Services Logistical Services Recycling & Waste Management Photography Services Renovation Projects Signs & Graphics Snow Command Center Request Service Special Services Terrapin Trader Warehouse
Arboretum and Botanical Garden Campus Facilities Plan Current Construction Map NextGen Energy Program SHIFT Student Facilities Fund Sustainability
ADA Transition Plan Building Inventory Design Criteria/Facilities Standards Facilities Archival Library Facility Quick Facts Glossary of Abbreviations & Acronyms OM&U Facility Managers On-Call General Contractor Specs Service Impacts Space Use Change Form UMD Office Standards UMD Spaces
Appreciation & Recognition Calendar Human Resources Tools & Resources Life@FM

Service Impacts

Road Closures
Location Area Start Finish Repair Type Repair Description Service Impact Type Contact Person Contact Phone

Fieldhouse Drive near the Northwest Corner of Stamp Student Union, Roadway Closure and Excavation Work Fieldhouse Drive near the Northwest Corner of Stamp Student Union *ROADWAY WILL BE REOPENED OUTSIDE OF WORKING HOURS NOTED* 09-28-2026 8:00 am 10-02-2026 6:00 pm Roadway Closure and Excavation Work A section of Fieldhouse Drive will need to be closed near the intersection with Union Lane, as shown on the attached drawing, to perform excavation work to locate and repair a potential underground leak in this area. Planned Horacio Torres 301-405-2222
Parking Lot 16A in front of Fraternity House 2, Partial Parking Lot Closure and Excavation Work Parking Lot 16A in front of Frat House 2 09-21-2026 8:00 am 09-25-2026 5:00 pm Parking Lot Closure, Excavation Work Planned excavation work will be performed to identify and repair a possible underground leak in Parking Lot 16A in front of Fraternity House 2 Planned Horacio Torres 301-405-2222
Fieldhouse Drive near the Intersection with Union Lane, Lane Closure Fieldhouse Drive near the Intersection with Union Lane 09-18-2026 9:30 am 09-18-2026 12:30 pm Lane Closure The eastbound lane on Fieldhouse Drive will be partially closed near its intersection with Union Lane to restore the roadway following the excavation work previously performed in this area. Planned Horacio Torres 301-405-2222
Purple Line: Campus-wide Overnight Testing Impacts **SEE ATTACHED MAP FOR IMPACTS** 08-29-2026 10:00 pm 01-26-2027 6:00 am Purple Line Construction Purple Line Construction Planned Casey Ferraro 301-405-2222
Purple Line: Campus-wide Periodic Lane and Sidewalk Closures **SEE ATTACHED MAP FOR IMPACTED ROADWAYS, SIDEWALKS** 08-29-2026 12:00 am 01-26-2027 11:00 pm Purple Line Construction Purple Line Construction Planned Casey Ferraro 301-405-2222
Parking Lot #Z, Partial Parking Lot Closure Southeast corner of the parking lot. 12-22-2025 7:00 am 09-01-2028 4:00 pm Partial Parking Lot Closure To facilitate the construction laydown area for the Health and Human Sciences Complex project. Planned Randall Phillips 443-500-2356
Service Outages & Impacts
Location Area Start Finish Repair Type Repair Description Service Impact Type Contact Person Contact Phone

Manhole 205 - Multiple Buildings Impacted: Steam Outage and HVAC Heating Hot Water Outage Plant Sciences Building, Biology-Psychology Building, Hornbake Library, Regents Drive Parking Garage, Geology Building, Bioscience Research Building 09-25-2026 6:00 am 09-25-2026 10:00 am Domestic Hot Water, and Steam Outages To facilitate the testing of an isolation valve in manhole 205 Planned Chrysanthe Broikos 301-405-2222
Plaza between the Wind Tunnel Building and the Computer Science Instructional Center - Sidewalk Closure Plaza 09-25-2026 6:00 am 04-30-2027 5:00 pm Plaz/Sidewalk Closure The plaza sidewalk area between the Wind Tunnel Building and the Computer Science Instructional Center will be closed to store equipment and materials for construction activities. Planned Randall Phillips 301-405-2222
Glenn L. Martin Hall and C. Daniel Mote, Jr. Engineering Laboratory Building - Fire Alarm System and Suppression Testing and Inspection Entire Building 09-23-2026 6:00 am 09-24-2026 3:00 pm Fire Alarm/Suppression Testing and Inspection Fire Alarm and Suppression Testing and Inspection Planned Clarence Brown 301-405-0134
Atlantic Building - Room 0312, Electrical Outage Room 0312 09-22-2026 6:00 am 09-22-2026 8:00 am Electrical Ouage To safely disconnect power to circuits serving the construction area of the first floor of Wing 3 Planned Jim Andrews 301-405-2222
J.M. Patterson Building, Fire Alarm System and Suppression Testing and Inspection Entire Building 09-22-2026 6:00 am 09-22-2026 3:00 pm Fire Alarm/Suppression Testing and Inspection Fire Alarm and Suppression Testing and Inspection Planned Clarence Brown 301-405-0134
Atlantic Building - Wing 1 and Wing 3, HVAC Steam Outage Wing 1 and Wing 3 ONLY 09-21-2026 5:00 pm 09-22-2026 2:00 pm Steam Outage To install an isolation valve on the HVAC steam equipment in the Atlantic Building, there will be a planned steam outage that will impact Wings 1 and 3 in the building. Planned James Andrews 301-405-2222
Microbiology Building - Lift Work for Roof Repairs, Temporary Sidewalk Closure, September 21 - October 2 Exterior roof and sidewalk 09-21-2026 7:00 am 10-02-2026 4:00 pm Lift Work, Roof Repair To accommodate lift work for roof repairs. Planned Colin Davis 301-405-2222
Brendan Iribe Center, Fire Alarm System and Suppression Testing and Inspection Entire Building 09-21-2026 6:00 am 09-21-2026 3:00 pm Fire Alarm/Suppression Testing and Inspection Fire Alarm and Suppression Testing and Inspection Planned Clarence Brown 301-405-0134
Urgent Outage Notification: Campus-Wide Steam Pressure Reduction Entire Building(s) 09-18-2026 8:09 am Steam Pressure Reduction Due to equipment degradation at the Interim Boiler Plant, steam production is temporarily limited. This will result in reduced steam pressures across campus. Equipment restoration efforts are underway, and updates will be provided as soon as they become Unplanned Gregg Garbesi 301-405-2222
Memorial Chapel, Fire Alarm System and Suppression Testing and Inspection Entire Building 09-18-2026 6:00 am 09-18-2026 3:00 pm Fire Alarm/Suppression Testing and Inspection Fire Alarm and Suppression Testing and Inspection Planned Clarence Brown 301-405-0134
Atlantic Building - Data Center Room 0302, Electrical Outage Data Center Room 0302 09-17-2026 6:00 pm 09-18-2026 6:00 am Electrical Outage To relocate the electrical power that supports Data Center Room 0302 at the Atlantic Building, there will be a planned electrical outage that will only impact this room. Planned James Andrews 301-405-2222
Urgent Outage Notification: Biology-Psychology - Fourth Floor of Wing 2, HVAC Heating Outage Fourth Floor of Wing 2 09-17-2026 2:00 pm HVAC Heating Outage Emergency repairs are needed on the HVAC equipment that provides heating to the fourth floor of Wing 2 at the Biology-Psychology Building, resulting in a heating outage in this area of the building. Planned Michael Dickman 301-405-2222
Hornbake Library - Fourth Floor on North and South Sides, HVAC Heating Hot Water Outage Fourth Floor on North and South Sides 08-24-2026 6:00 am 09-29-2026 3:30 pm HVAC Heating Hot Water Outage To perform upgrades to the HVAC components. Planned James Trythall 301-405-2222
Urgent Outage Notification: Manufacturing Building, HVAC Air Conditioning Outage M1101 (Cube Farm) 07-15-2026 8:00 pm HVAC Systems Outage, HVAC Air Conditioning Facilities Management crews are working to repair the air conditioning units that provide cooling to the M1101 (Cube Farm) area of the Manufacturing Building. As a result, this area of the building currently has an air conditioning outage. Unplanned Charles Ivey 301-405-2222
Urgent Outage Notification: Manufacturing Building, HVAC Systems Outage North side, first floor of the building **SEE MAP ATTACHED** 06-25-2026 11:50 am HVAC Systems Outage An urgent HVAC systems outage that is impacting HVAC equipment responsible for HVAC air conditioning and cooling for the north side of the first floor at the Manufacturing Building. Unplanned Charles Ivey 301-405-2222
Elevator
Location Area Start Finish Repair Type Repair Description Service Impact Type Contact Person Contact Phone

Urgent Outage Notification: Xfinity Center - Freight Elevator Car 1, Elevator Outage Elevator Car 1 (Freight) 09-15-2026 11:00 am Elevator Outage Facilities Management crews are responding to emergency maintenance repairs needed for Freight Elevator Car 1 at the Xfinity Center, which is currently out of service until further notice. Emergency Shane Kogok 301-405-2222
Urgent Outage Notification: Clarice Smith Performing Arts Center - Elevator Car 71, Elevator Outage Elevator Car 71 09-10-2026 2:15 pm Elevator Outage Facilities Management crews are responding to an urgent elevator outage. Emergency Mark Loriso 301-405-2222
Cumberland Hall, Elevator Modernization Elevator Car #1 07-27-2026 1:00 pm Elevator modernization Elevator car 1 has been taken out of service at Cumberland Hall for a planned modernization upgrade of the elevator car. Planned Chris O'Dea 301-405-2222
Ellicott Hall - Elevator 3, Elevator Modernization Elevator Car 3 04-09-2026 6:00 am Elevator modernization Modernization of Elevator #3 Planned Chris O'Dea 301-405-2222