Location Area Start Finish Repair Type Repair Description Service Impact Type Contact Person Contact Phone

Parking Lot A - Excavation Work, Partial Parking Lot Closure Near Northeast corner of DTP/SCUB 2 *SEE ATTACHED MAP* 04-20-2026 7:00 pm 04-24-2026 4:00 pm Excavation Work, Partial Parking Lot Closure To perform excavation work to repair an underground hot water leak in Lot A. Planned Randolph Bayer 301-405-2222
Diamondback Drive, Partial Roadway Closure Between Hotel Drive and Rossborough Lane 03-30-2026 6:00 am 04-30-2026 5:00 pm Partial Roadway Closure To perform excavation work to install underground equipment at the Central Energy Plant as part of the NextGen project. Planned Antonio Sanchez 301-405-2222
Purple Line: Campus-wide Periodic Sidewalk Closures Campus-wide Periodic Sidewalk Closures 03-09-2026 7:00 am 05-29-2026 4:00 pm Purple Line Construction Purple Line Construction Planned Casey Ferraro 301-405-9168
Parking Lot #Z, Partial Parking Lot Closure Southeast corner of the parking lot. 12-22-2025 7:00 am 09-01-2028 4:00 pm Partial Parking Lot Closure To facilitate the construction laydown area for the Health and Human Sciences Complex project. Planned Randall Phillips 443-500-2356
Service Outages & Impacts
Location Area Start Finish Repair Type Repair Description Service Impact Type Contact Person Contact Phone

North Hill Resident Halls, HVAC Chilled Water Outage Anne Arundel Hall, Queen Anne's Hall, St. Mary's Hall, Somerset Hall, Dorchester Hall; Work site at NW Corner of St. Mary's Hall *SEE MAP ATTACHED* 04-20-2026 7:00 am 04-20-2026 3:00 pm HVAC Chilled Water Outage To perform emergency repairs on an underground leak on an HVAC dual temperature and chilled water line outside of the northwest corner of St. Mary's Hall. Planned Horacio Torres 301-405-2222
Manufacturing Building - Lift Work, Gutter Repair Work South Exterior Side of the Building *SEE MAP ATTACHED* 04-20-2026 7:00 am 04-22-2026 4:00 pm Lift Work, Gutter Repair Work To repair a section of gutters on the south side of the building. Planned Colin Davis 301-405-2222
Tawes Hall, Flooring Work Mechanical Room 4101, Work Activity Impacting Third Floor of Wing 2 *SEE MAP FOR ROOMS IMPACTED* 04-17-2026 7:00 am 04-24-2026 3:00 pm Flooring Work Flooring work to grind down and seal the floor to place HVAC equipment. Planned Michael Dickman 301-405-2222
Urgent Outage: Reckord Armory, HVAC Heating Outage Basement ROTC Offices, *ONLY* 01-28-2026 12:40 pm HVAC Heating Outage Due to repairs needed on a damaged HVAC heating component. Emergency Gerald Young 301-405-2222
Elevator
Location Area Start Finish Repair Type Repair Description Service Impact Type Contact Person Contact Phone

Ellicott Hall - Elevator 3, Elevator Modernization Elevator 3 04-09-2026 7:00 am 07-13-2026 11:59 pm Elevator modernization This is a planned modernization upgrade of the elevator. Planned Chris O'Dea 301-405-2222
Centreville Hall - Elevator 3, Elevator Modernization Elevator 3 02-16-2026 1:52 pm Elevator modernization For a planned modernization upgrade of the elevator. Planned Chris O'Dea 301-405-2222
Cumberland Hall, Elevator Modernization Elevator Car #2 02-03-2026 8:00 pm Elevator modernization Modernization of Elevator #2 Planned Chris O'Dea 301-405-2222
McKeldin Library Elevator Car #4 02-03-2026 8:00 am 04-30-2026 4:00 pm Elevator modernization Modernization of Elevator #4 Planned Chris O'Dea 301-405-2222