Location Area Start Finish Repair Type Repair Description Service Impact Type Contact Person Contact Phone

*MULTIPLE BUILDINGS* Electrical Outage Environmental Service Facility, Terrapin Trail Parking Garage, Heavy Equipment Building, Wye Oak Building 02-07-2026 6:00 am 02-07-2026 3:00 pm Electrical Outage To safely perform required preventive maintenance on electrical equipment. Planned Jason Reardon 240-694-8431
Urgent Outage: Brendan Iribe Center, Flood/Leak Response - Interior Building Closure Floors Sixth through Fourth, West Side: 5104, 5109, 5116, 5119, 5120, 5124, 5126, 5128, 5130, 5148, 5150, 5152, 5156, 5202, 5204, 4116, 4120 01-29-2026 2:50 pm Flood Response Flood from a burst sprinkler line, impacting multiple areas, mostly centered around the fifth floor west side of the building and the freight elevator throughout the building. Emergency Brian Trest 301-405-2222
Urgent Outage: Reckord Armory, Entrance/Building Closures Entire building, all entrances. 01-28-2026 8:30 pm Building/Entrance Closures Due to hazardous conditions of falling snow and ice from the roof of the building. Emergency Glynnis Bowman 301-405-2222
Urgent Outage: Reckord Armory, HVAC Heating Outage Basement ROTC Offices, *ONLY* 01-28-2026 12:40 pm HVAC Heating Outage Due to repairs needed on a damaged HVAC heating component. Emergency Gerald Young 301-405-2222
Severn Building - HVAC Systems Outage, Domestic Hot Water Outage Entire Building. 01-28-2026 10:00 am 01-30-2026 10:00 am HVAC Systems Outage, Domestic Hot Water Outage To support the required Washington Gas Curtailment request for this building. Planned Zachary Eide 301-405-1286
Urgent Outage: HVAC Heating Outage - Animal Sciences / Agricultural Engineering Building Wing #1, First Floor - Classrooms, and Labs (center section of Wing #1) 01-20-2026 10:45 pm HVAC Heating Service Repairs needed to a broken steam coil on air handler unit #2 Emergency Charles Ivey 301-405-2222
Symons Hall - Hallways, Partial Interior Building Closure Hallways, Entire Building. 01-05-2026 6:00 am 01-30-2026 4:00 pm Partial Interior Building Closure To facilitate the replacement of hallway lighting throughout the entire building. Planned Kenneth Jester 443-716-6905
Elevator
Location Area Start Finish Repair Type Repair Description Service Impact Type Contact Person Contact Phone

Urgent Outage: Ellicott Hall, Elevator Outage Elevator Car #1 01-31-2026 1:24 pm Elevator Outage Elevator Repairs Unplanned Chris O'Dea 301-405-2222
Urgent Outage: H.J. Patterson Hall, Elevator Outage Elevator Car #1 01-30-2026 10:42 am Elevator Outage Elevator Repairs Emergency Chris O'Dea 301-405-2222
Urgent Outage: Brendan Iribe Center, Elevator Outage Elevator Cars 1, 2, 3, 4 =========== **AS OF 1/30/26 - ELEVATORS 1, 2, 4 ARE IN SERVICE; 3 IS OUT OF SERVICE** 01-29-2026 3:11 pm Elevator Outage Shut down due to flooding event on the 6th and 5th floors of the building. Emergency Chris O'Dea 301-405-2222
Urgent Outage: Biology-Psychology Building , Elevator Outage Elevator Car 2 01-29-2026 10:21 am Elevator Outage To perform necessary repairs so the elevator car is operational. Emergency Chris O'Dea 301-405-2222
McKeldin Library Elevator Car #4 01-28-2026 8:00 am 04-30-2026 4:00 pm Elevator modernization Modernization of Elevator #4 Planned Chris O'Dea 301-405-2222
Stamp Student Union #163 Elevator Car #5 12-19-2025 12:15 pm Elevator modernization Modernization of Elevator #5 Planned Chris O'Dea 301-405-2222
Centreville Hall #098 Elevator Car #4 09-05-2025 12:03 pm Elevator modernization Modernization of Elevator #4 Planned Chris O'Dea 301-405-2222
Road Closures
Location Area Start Finish Repair Type Repair Description Service Impact Type Contact Person Contact Phone

Exterior West - Van Munching Hall, Partial Sidewalk Closure Portion of sidewalk along Mowatt Lane. 01-29-2026 9:49 pm Partial Sidewalk Closure Repairing a leak on an underground heating hot water line that serves Van Munching Hall and the Architecture Building. Emergency Randolph Bayer 301-356-7812
WeWork Building, Parking Lot Closure Parking Lot J1 01-27-2026 9:00 am 01-31-2026 9:00 am Parking Lot Closure To accommodate an emergency fuel delivery to the Central Energy Plant. Planned Zachary Eide 301-405-2222
Parking Lot #Z, Partial Parking Lot Closure Southeast corner of the parking lot. 12-22-2025 7:00 am 09-01-2028 4:00 pm Partial Parking Lot Closure To facilitate the construction laydown area for the Health and Human Sciences Complex project. Planned Randall Phillips 443-500-2356
Purple Line Construction University Boulevard between Temple Street and Adelphi Road (near Graduate Hills Apartments) • Adelphi Road between Tulane Drive and University Boulevard (near Graduate Hills Apartments and UMGC) • Campus Drive between Adelphi Road and Presidential 11-01-2025 7:00 am 01-26-2026 12:00 pm Purple Line Construction Purple Line Construction Planned Casey Ferraro 301-405-9168
Parking Lot #GG1 - Partial Parking Lot Closure, Sidewalk Closure East side of the A.V. Williams Building 08-01-2025 5:00 am 04-15-2026 5:00 pm Partial Parking Lot, Sidewalk Closure To install the new cooling tower north of the electric pad at the #GG1 parking lot. Planned Tim Zhao 240-383-2431