Location Area Start Finish Repair Type Repair Description Service Impact Type Contact Person Contact Phone

Clarice Smith Performing Arts Center, Electrical Outage Entire Building. 12-30-2025 6:00 am 12-30-2025 3:00 pm Electrical Outage To perform maintenance on the building's electrical distribution equipment. Planned Randolph Bayer 301-356-7812
*MULTIPLE BUILDINGS* Electrical Outage Entire Buildings - Morrill Hall, Taliaferro Hall, Francis Scott Key Hall, Tydings Hall, Chincoteague Hall 12-29-2025 6:00 am 12-29-2025 3:00 pm Electrical Outage To perform maintenance on the building's electrical distribution equipment. Planned Randolph Bayer 301-356-7812
Chesapeake Building, Electrical Outage Entire Building. 12-27-2025 6:00 am 12-27-2025 3:00 pm Electrical Outage To perform maintenance on the building's electrical distribution equipment. Planned Randolph Bayer 301-356-7812
*MULTIPLE BUILDINGS* Lift Work, Gutter/Downspout Maintenance Clarence M. Mitchell, Jr. Building / Thomas V. Miller, Jr. Administration Building / Reckord Armory Building / Lee Building 12-26-2025 7:00 am 12-31-2025 4:00 pm Lift Work Gutter and Downspout Maintenance, Cleaning. Planned Colin Davis 301-458-1741
Reckord Armory, Fire Alarm/Suppression Testing and Inspection Entire Building 12-23-2025 6:00 am 12-23-2025 3:00 pm Fire Alarm/Suppression Testing and Inspection Fire Alarm and Suppression Testing and Inspection Planned Clarence Brown 301-405-0134
*MULTIPLE BUILDINGS* Frat Row, Leonardtown Buildings - Electrical Outage Frat House #6 thru #9, Leonardtown bldg. #244 thru #249, Leonardtown Community Center bldg.#250 12-22-2025 7:00 am 12-23-2025 3:00 pm Electrical Outage To allow the connection of electrical service to the new Graduate Housing project. **12/22: 7am-3pm; 12/23: 8am-2pm** Planned Randolph Bayer 301-356-7812
*MULTIPLE BUILDINGS* Sidewalk Closure, HVAC Chilled Water Outage (HVAC Chilled Water - Entire Buildings; Sidewalk Closure - Entrance south of CSPAC): Clarice Smith Performing Arts Center, Riggs Alumni Center 12-22-2025 6:00 am 01-23-2026 6:00 pm HVAC Chilled Water Outage To complete the new HVAC- Chilled Water Piping system from DTP/SCUB-3 for the Clarice Smith Performing Arts Center and Riggs Alumni Center. Planned Al Neshati 301-405-4454
Susquehanna Hall, Elevator Outage Building's Only Elevator Car 12-22-2025 6:00 am 12-24-2025 5:00 pm Elevator Outage To install a card reader in the elevator. Planned Chris O'Dea 301-405-7839
Shoemaker Building, Fire Alarm/Suppression Testing and Inspection Entire Building 12-22-2025 6:00 am 12-22-2025 3:00 pm Fire Alarm/Suppression Testing and Inspection Fire Alarm and Suppression Testing and Inspection Planned Clarence Brown 301-405-0134
Plant Sciences Building, HVAC Systems Outage Entire Building; loading dock area will be closed. 12-22-2025 6:00 am 12-23-2025 6:00 pm HVAC Systems Outage To replace two motors on HVAC equipment on the building's roof. Planned Elber Coreas 240-750-8850
Chemical and Nuclear Engineering Building, Domestic Water Outage Entire Building. 12-20-2025 8:00 am 12-20-2025 12:00 pm Domestic Water Outage An emergency repair to an active leak on a domestic water line in room #1121 in the building. Planned Daniel Narh 301-448-2798
Marie Mount Hall, Lift Work, Gutter/Downspout Maintenance sidewalk around building 12-20-2025 7:00 am 12-23-2025 4:00 pm Exterior Sidewalk Closure to clean gutters and downspouts Planned Colin Davis 301-458-1741
Road Closures
Location Area Start Finish Repair Type Repair Description Service Impact Type Contact Person Contact Phone

Plant Sciences Building - Parking Lot Closure, Loading Dock Closure Parking lot and loading dock area located behind the Plant Sciences Building. 12-29-2025 6:00 am 12-29-2025 6:00 pm Parking Lot Closure, Loading Dock Closure To set up a large crane required to remove and replace two cooling towers on the roof of the building. Planned James Trythall 301-405-3463
Parking Lot #Z, Partial Parking Lot Closure Southeast corner of the parking lot. 12-22-2025 7:00 am 09-01-2028 4:00 pm Partial Parking Lot Closure To facilitate the construction laydown area for the Health and Human Sciences Complex project. Planned Randall Phillips 443-500-2356
Stadium Drive, Partial Road Closure South side of the Atlantic Building facing Regents Drive Parking Garage. 12-22-2025 7:00 am 12-23-2025 5:00 pm Partial Road Closure Repair and replacement of a section of sunken and heaved asphalt with concrete to restore roadway stability and safety. Planned Charles Patterson 301-789-5078
Hotel Drive, Partial Road Closure Area of road between the UMD Hotel and the Service Building. 12-22-2025 6:00 am 12-22-2025 4:00 pm Partial Road Closure To allow access to the telecom manhole to pull the fiber backbone in support of the Zupnik Hall Project. Planned Daniel Klenner 240-882-5052
Washington Hall, Allegany Hall, Charles Hall - Sidewalk Closure Above the northeast corner of Allegany Hall, below the southeast corner of Washington Hall, northwest corner of Charles Hall 12-22-2025 6:00 am 12-31-2025 5:00 pm Sidewalk Closure To repair an underground hot water leak occurring in this area. Planned Randolph Bayer 301-356-7812
Fieldhouse Drive - Partial Roadway/Lane Closure Fieldhouse Drive and Alumni Drive near Tyser Tower, Riggs Alumni Center, Cole Student Activities Building, and DTP/SCUB-3. 12-22-2025 6:00 am 01-23-2026 6:00 pm Partial Roadway Closure To complete the new HVAC- Chilled Water Piping system from DTP/SCUB-3 for the Clarice Smith Performing Arts Center and Riggs Alumni Center. Planned Al Neshati 301-405-4454
Parking Lot #E, Partial Parking Lot Closure Between Martin Hall and the C. Daniel Mote, Jr. Engineering Lab Building. 12-20-2025 6:00 am 01-04-2026 12:00 pm Parking Lot Closure To install concrete and associated items to allow for trash compactor placement. Planned Daniel Klenner 240-882-5052
Purple Line Construction Baltimore Avenue between Hotel Drive and Fraternity Row 12-08-2025 9:00 am 12-19-2025 4:00 pm Purple Line Construction Purple Line Construction Planned Casey Ferraro 301-405-9168
Purple Line Construction University Boulevard between Temple Street and Adelphi Road (near Graduate Hills Apartments) • Adelphi Road between Tulane Drive and University Boulevard (near Graduate Hills Apartments and UMGC) • Campus Drive between Adelphi Road and Presidential 11-01-2025 7:00 am 01-26-2026 12:00 pm Purple Line Construction Purple Line Construction Planned Casey Ferraro 301-405-9168
Purple Line Construction Rossborough Lane – Periodic Lane Closures Rossborough Lane 09-22-2025 7:00 am 12-22-2025 5:00 am Purple Line Purple Line Construction Planned Casey Ferraro 3014059168
Purple Line Construction Campus Drive Periodic Lane Closures – Core of Campus 09-15-2025 7:00 am 12-22-2025 5:00 pm Purple Line Construction Purple Line Construction Planned Casey Ferraro 301-405-9168
Parking Lot #GG1 - Partial Parking Lot Closure, Sidewalk Closure East side of the A.V. Williams Building 08-01-2025 5:00 am 04-15-2026 5:00 pm Partial Parking Lot, Sidewalk Closure To install the new cooling tower north of the electric pad at the #GG1 parking lot. Planned Tim Zhao 240-383-2431
Elevator
Location Area Start Finish Repair Type Repair Description Service Impact Type Contact Person Contact Phone

Stamp Student Union #163 Elevator Car #5 12-19-2025 12:15 pm Elevator modernization Modernization of Elevator #5 Planned Chris O'Dea 301-405-2222
Centreville Hall #098 Elevator Car #4 09-05-2025 12:03 pm Elevator Repairs Modernization of Elevator #4 Planned Shane Kogok 301-405-2222
Prince Frederick Hall #425 Elevator Car #5 01-31-2025 2:37 pm Flood water damage Water flood damage Emergency Shane Kogok 443-758-7260