Skip to main content

Service Impacts

Service Outages & Impacts
Location Area Start Finish Repair Type Repair Description Service Impact Type Contact Person Contact Phone

Hornbake Steam Heatiang Hot Water/Steam & Chilled Water Building 10-27-2025 6:00 am 10-31-2025 4:00 pm Chilledt Water, Steam, Heating Hot Water Outage Replace Air Handler Planned Michael Dickman 3014581877
H.J. Patterson Hall Fire Alarm/Suppression Testing and Inspection Building 10-22-2025 6:00 am 10-22-2025 3:00 am Fire Alarm Testing Fire alarm testing Planned Clarence Brown 3014050134
Gossett Hall Fire Alarm/Suppression Testing and Inspection Building 10-21-2025 6:00 am 10-21-2025 3:00 pm Fire Alarm Testing Fire alarm testing Planned Clarence Brown 3014050134
Symons Hall Fire Alarm/Suppression Testing and Inspection Building 10-20-2025 6:00 am 10-20-2025 3:00 pm Fire Alarm Testing Fire alarm testing Planned Clarence Brown 3014050134
Technology Advancement Program Building Fire Alarm/Suppression Testing and Inspection Building 10-17-2025 6:00 am 10-17-2025 3:00 pm Fire Alarm Testing Fire alarm testing Planned Clarence Brown 3014050134
Marie Mount Hall Fire Alarm/Suppression Testing and Inspection Building 10-16-2025 6:00 am 10-16-2025 3:00 am Fire Alarm Testing Fire alarm testing Planned Clarence Brown 3014050134
Benjamin Building Fire Alarm/Suppression Testing and Inspection Building 10-15-2025 6:00 am 10-15-2025 3:00 pm Fire Alarm Test Fire Alarm and Suppression Testing and Inspection Planned Clarence Brown 301-405-0134
Tydings Hall Fire Alarm/Suppression Testing and Inspection Building 10-14-2025 6:00 am 10-14-2025 3:00 pm Fire Alarm Testing Fire alarm testing Planned Clarence Brown 3014050134
William E. Kirwan Hall Fire Alarm/Suppression Testing and Inspection Building 10-13-2025 6:00 am 10-14-2025 3:00 pm Fire Alarm Test Fire alarm testing Planned Clarence Brown 3014050134
Animal Science Building Flooring Installation Rooms 2142 2144 10-13-2025 4:00 am 10-13-2025 4:00 pm Flooring Installation Apply MMA Flooring Planned Raquel Gayle 3018528782
Atlantic Building, Steam Outage Wing #1 10-10-2025 3:00 pm 10-14-2025 7:00 am Steam/Utility Outage To relocate a steam pipe that is too close to the chill water piping, preventing adequate insulation. Planned Elber Coreas 240-750-8850
A.V. Williams Building, Electrical Outage Wings #1 and #2 of the building. 10-09-2025 1:30 pm 10-09-2025 3:30 pm Electrical Outage To replace the failed components on the main electrical switchgear. Planned Chris O'Dea 301-405-7839
Biology-Psychology Building, Steam Outage Entire Building. 10-09-2025 7:00 am 10-09-2025 1:00 pm Steam Outage, HVAC Heating Outage, Domestic Hot Water Outage To fix a steam leak on an HVAC component. Planned Alonzo Banks 301-395-2303
District Thermal Plant (DTP) #3, HVAC Chilled Water Outage ENTIRE BUILDINGS: Clarice Smith Performing Arts Center, Riggs Alumni Center, Stamp Student Union 10-09-2025 6:00 am 10-09-2025 7:00 am HVAC Chilled Water Outage To replace an electrical component on an HVAC air compressor in the building. Planned Randolph Bayer 301-356-7812
Clarence M. Mitchell, Jr. Building - Sidewalk Closure, Entrance Closure Entrance and immediate surrounding sidewalk at southwest entrance #0197A. 10-06-2025 7:00 am 10-10-2025 5:00 pm Sidewalk and Entrance Closure To repair and rebuild the worn-down step that leads into this area of the building. Planned Charles Patterson 301-789-5078
Atlantic Building, Exterior Painting Exterior of Wing #4 on the first floor. 10-01-2025 8:00 am 10-15-2025 3:30 pm Exterior painting A contractor will prepare, prime, and paint exterior doors, bike racks, metal railings, and window security guards. Planned Rolando Mendez 301-852-1308
Road Closures
Location Area Start Finish Repair Type Repair Description Service Impact Type Contact Person Contact Phone

Purple Line Construction Overnight Closures for Overhead Wire Installation 10-13-2025 10:00 pm 10-18-2025 5:00 am Purple Line Construction Purple Line Construction Planned Casey Ferraro 301-405-9168
Campus Drive main entrance near Baltimore Ave Campus Drive near Baltimore Ave 10-13-2025 7:00 am 10-14-2025 5:00 pm Partial Road Closure Repave Planned Charles Patterson 3017895078
Reckord Armory Sidewalk Closure Exterior Sidewalk 10-12-2025 7:00 am 10-14-2025 5:00 pm Exterior Sidewalk Closure Concrete repair Planned Charles Patterson 3017895078
Campus Drive, Paint Branch Drive, Valley Drive - Partial Roadway Closures Campus Drive westbound near the Baltimore Avenue main gate; Paint Branch Drive northbound near the Biomolecular Sciences Building; Valley Drive southbound near the Eppley Recreation Center. 10-08-2025 7:00 am 10-09-2025 5:00 pm Partial Roadway Closure To repair damaged drain inlets in the roadway at these locations that are failing. Planned Charles Patterson 301-405-0769
Diamondback Drive - Lane Closure, Road Closure LANE CLOSURE: October 8th at 7:00 a.m. until October 10th at 5:00 p.m.; ROAD CLOSURE: October 11th at 7:00 a.m. until October 25th at 5:00 p.m. 10-08-2025 7:00 am 10-25-2025 5:00 pm Road Closure, Lane Closure Installation of a shoring platform on the southbound lane of Diamondback Drive; Installation and operation of a crane on the northbound lane of Diamondback Drive. Planned Antonio Sanchez-Tovar 225-454-2185
Animal Sciences / Agricultural Engineering Building, Sidewalk Closure Along the north side of Industrial Lane and the east side of Regents Drive. 10-01-2025 6:00 am 10-30-2025 5:00 pm Sidewalk Closure To install underground condensate piping as part of the NextGen energy improvement projects. Planned Chrysanthe Broikos 301-956-6155
Thomas V. Miller Adminstration Building Sidewalk Closure Sidewalk Closure 09-29-2025 7:00 am 10-13-2025 4:30 pm Exterior Sidewalk Closure Concrete repair Planned Frank Dudley 3018320943
Purple Line Construction Rossborough Lane – Periodic Lane Closures Rossborough Lane 09-22-2025 7:00 am 12-22-2025 5:00 am Purple Line Purple Line Construction Planned Casey Ferraro 3014059168
Purple Line Construction Campus Drive Periodic Lane Closures – Core of Campus 09-15-2025 7:00 am 12-22-2025 5:00 pm Purple Line Construction Purple Line Construction Planned Casey Ferraro 301-405-9168
Fieldhouse Drive Sidewalk Closure Sidewalk Closure 08-18-2025 12:00 am 11-15-2025 12:00 am Exterior Sidewalk Closure Scub 3 Renovations Planned Al Neshati 3014054454
Parking Lot #GG1 - Partial Parking Lot Closure, Sidewalk Closure East side of the A.V. Williams Building 08-01-2025 5:00 am 04-15-2026 5:00 pm Partial Parking Lot, Sidewalk Closure To install the new cooling tower north of the electric pad at the #GG1 parking lot. Planned Tim Zhao 240-383-2431
Elevator
Location Area Start Finish Repair Type Repair Description Service Impact Type Contact Person Contact Phone

Centreville Hall #098 Elevator Car #4 09-05-2025 12:03 pm Elevator Repairs Modernization of Elevator #4 Planned Shane Kogok 301-405-2222
Prince Frederick Hall #425 Elevator Car #5 01-31-2025 2:37 pm Flood water damage Water flood damage Emergency Shane Kogok 443-758-7260
Annapolis Hall #008, Elevator Outage Building's Only Elevator Car Elevator Outage Elevator outage as a result of construction work occurring in the building. (UNTIL FURTHER NOTICE) Planned Patricia Carey 301-314-3486
Back to Top