Service Impacts
| Location | Area | Start | Finish | Repair Type | Repair Description | Service Impact Type | Contact Person | Contact Phone |
|
|---|---|---|---|---|---|---|---|---|---|
| *MULTIPLE BUILDINGS* Electrical Outage | Environmental Service Facility, Terrapin Trail Parking Garage, Heavy Equipment Building, Wye Oak Building | 02-07-2026 6:00 am | 02-07-2026 3:00 pm | Electrical Outage | To safely perform required preventive maintenance on electrical equipment. | Planned | Jason Reardon | 240-694-8431 | |
| Urgent Outage: Brendan Iribe Center, Flood/Leak Response - Interior Building Closure | Floors Sixth through Fourth, West Side: 5104, 5109, 5116, 5119, 5120, 5124, 5126, 5128, 5130, 5148, 5150, 5152, 5156, 5202, 5204, 4116, 4120 | 01-29-2026 2:50 pm | Flood Response | Flood from a burst sprinkler line, impacting multiple areas, mostly centered around the fifth floor west side of the building and the freight elevator throughout the building. | Emergency | Brian Trest | 301-405-2222 | ||
| Urgent Outage: Reckord Armory, Entrance/Building Closures | Entire building, all entrances. | 01-28-2026 8:30 pm | Building/Entrance Closures | Due to hazardous conditions of falling snow and ice from the roof of the building. | Emergency | Glynnis Bowman | 301-405-2222 | ||
| Urgent Outage: Reckord Armory, HVAC Heating Outage | Basement ROTC Offices, *ONLY* | 01-28-2026 12:40 pm | HVAC Heating Outage | Due to repairs needed on a damaged HVAC heating component. | Emergency | Gerald Young | 301-405-2222 | ||
| Severn Building - HVAC Systems Outage, Domestic Hot Water Outage | Entire Building. | 01-28-2026 10:00 am | 01-30-2026 10:00 am | HVAC Systems Outage, Domestic Hot Water Outage | To support the required Washington Gas Curtailment request for this building. | Planned | Zachary Eide | 301-405-1286 | |
| Urgent Outage: HVAC Heating Outage - Animal Sciences / Agricultural Engineering Building | Wing #1, First Floor - Classrooms, and Labs (center section of Wing #1) | 01-20-2026 10:45 pm | HVAC Heating Service | Repairs needed to a broken steam coil on air handler unit #2 | Emergency | Charles Ivey | 301-405-2222 | ||
| Symons Hall - Hallways, Partial Interior Building Closure | Hallways, Entire Building. | 01-05-2026 6:00 am | 01-30-2026 4:00 pm | Partial Interior Building Closure | To facilitate the replacement of hallway lighting throughout the entire building. | Planned | Kenneth Jester | 443-716-6905 |
| Location | Area | Start | Finish | Repair Type | Repair Description | Service Impact Type | Contact Person | Contact Phone |
|
|---|---|---|---|---|---|---|---|---|---|
| Urgent Outage: Ellicott Hall, Elevator Outage | Elevator Car #1 | 01-31-2026 1:24 pm | Elevator Outage | Elevator Repairs | Unplanned | Chris O'Dea | 301-405-2222 | ||
| Urgent Outage: H.J. Patterson Hall, Elevator Outage | Elevator Car #1 | 01-30-2026 10:42 am | Elevator Outage | Elevator Repairs | Emergency | Chris O'Dea | 301-405-2222 | ||
| Urgent Outage: Brendan Iribe Center, Elevator Outage | Elevator Cars 1, 2, 3, 4 =========== **AS OF 1/30/26 - ELEVATORS 1, 2, 4 ARE IN SERVICE; 3 IS OUT OF SERVICE** | 01-29-2026 3:11 pm | Elevator Outage | Shut down due to flooding event on the 6th and 5th floors of the building. | Emergency | Chris O'Dea | 301-405-2222 | ||
| Urgent Outage: Biology-Psychology Building , Elevator Outage | Elevator Car 2 | 01-29-2026 10:21 am | Elevator Outage | To perform necessary repairs so the elevator car is operational. | Emergency | Chris O'Dea | 301-405-2222 | ||
| McKeldin Library | Elevator Car #4 | 01-28-2026 8:00 am | 04-30-2026 4:00 pm | Elevator modernization | Modernization of Elevator #4 | Planned | Chris O'Dea | 301-405-2222 | |
| Stamp Student Union #163 | Elevator Car #5 | 12-19-2025 12:15 pm | Elevator modernization | Modernization of Elevator #5 | Planned | Chris O'Dea | 301-405-2222 | ||
| Centreville Hall #098 | Elevator Car #4 | 09-05-2025 12:03 pm | Elevator modernization | Modernization of Elevator #4 | Planned | Chris O'Dea | 301-405-2222 |
| Location | Area | Start | Finish | Repair Type | Repair Description | Service Impact Type | Contact Person | Contact Phone |
|
|---|---|---|---|---|---|---|---|---|---|
| Exterior West - Van Munching Hall, Partial Sidewalk Closure | Portion of sidewalk along Mowatt Lane. | 01-29-2026 9:49 pm | Partial Sidewalk Closure | Repairing a leak on an underground heating hot water line that serves Van Munching Hall and the Architecture Building. | Emergency | Randolph Bayer | 301-356-7812 | ||
| WeWork Building, Parking Lot Closure | Parking Lot J1 | 01-27-2026 9:00 am | 01-31-2026 9:00 am | Parking Lot Closure | To accommodate an emergency fuel delivery to the Central Energy Plant. | Planned | Zachary Eide | 301-405-2222 | |
| Parking Lot #Z, Partial Parking Lot Closure | Southeast corner of the parking lot. | 12-22-2025 7:00 am | 09-01-2028 4:00 pm | Partial Parking Lot Closure | To facilitate the construction laydown area for the Health and Human Sciences Complex project. | Planned | Randall Phillips | 443-500-2356 | |
| Purple Line Construction | University Boulevard between Temple Street and Adelphi Road (near Graduate Hills Apartments) • Adelphi Road between Tulane Drive and University Boulevard (near Graduate Hills Apartments and UMGC) • Campus Drive between Adelphi Road and Presidential | 11-01-2025 7:00 am | 01-26-2026 12:00 pm | Purple Line Construction | Purple Line Construction | Planned | Casey Ferraro | 301-405-9168 | |
| Parking Lot #GG1 - Partial Parking Lot Closure, Sidewalk Closure | East side of the A.V. Williams Building | 08-01-2025 5:00 am | 04-15-2026 5:00 pm | Partial Parking Lot, Sidewalk Closure | To install the new cooling tower north of the electric pad at the #GG1 parking lot. | Planned | Tim Zhao | 240-383-2431 |