Location Area Start Finish Repair Type Repair Description Service Impact Type Contact Person Contact Phone

Wind Tunnel Building, Domestic Hot and Cold Water Outage Entire Building. 03-27-2026 7:00 am 03-27-2026 5:00 pm Domestic Hot Water Outage, Domestic Cold Water Outage To install isolation valves in preparation for a new domestic hot water heater in the building. Planned William Schmelyun 301-405-2222
Lee Building, Fire Alarm and Suppression Testing Entire Building 03-25-2026 6:00 pm 03-25-2026 2:00 pm Fire Alarm/Suppression Testing and Inspection Fire Alarm and Suppression Testing and Inspection Planned Tom Slater 301-405-1837
Thomas V. Miller, Jr. Administration Building, Fire Alarm/Suppression Testing and Inspection Entire Building 03-25-2026 6:00 am 03-25-2026 2:00 pm Fire Alarm/Suppression Testing and Inspection Fire Alarm and Suppression Testing and Inspection Planned Tom Slater 301-405-1837
Clarence M. Mitchell, Jr. Building, Fire Alarm and Suppression Testing and Inspection Entire Building. 03-25-2026 6:00 am 03-25-2026 2:00 pm Fire Alarm/Suppression Testing and Inspection Fire Alarm and Suppression Testing and Inspection Planned Zachary Smith 301-405-2222
LeFrak Hall, Fire Alarm And Suppression Testing And Inspection Entire Building. 03-25-2026 6:00 am 03-25-2026 3:00 pm Fire Alarm/Suppression Testing and Inspection Fire Alarm and Suppression Testing and Inspection Planned Clarence Brown 301-405-2222
A.V. Williams Building, HVAC Systems Outage Entire Building. 03-25-2026 6:00 am 03-27-2026 2:00 pm HVAC Systems Outage, Work Notice To perform mechanical work that involves filling and flushing the cooling tower. No impact to building or occupants; chilled water service provided by DTP/SCUB 4. Planned Tim Zhao 301-405-2222
Avrum Gudelsky Veterinary Center, Loading Dock Closure Loading Dock 4 03-25-2026 6:00 am 03-25-2026 5:00 pm Loading Dock Closure To remove two unused and decommissioned generators on the roof of the building. Planned Monico Flores 301-405-2222
Biomolecular Sciences Building, Fire Alarm and Suppression Testing And Inspection Entire Building. 03-24-2026 6:00 am 03-24-2026 3:00 pm Fire Alarm/Suppression Testing and Inspection Fire Alarm and Suppression Testing and Inspection Planned Clarence Brown 301-405-2222
Institute for Physical Science and Technology Building, Exterior Painting Entire Exterior of the Building. *SEE ATTACHED MAP* 03-23-2026 8:00 am 04-11-2026 5:00 pm Exterior painting A contractor will scrape, prime, and paint all of the doors, windows, and handrails around the building's exterior. Planned Rolando Mendez 301-405-2222
Plant Sciences Building, Exterior Painting Exterior North side of Building, Southwest Entrance, Loading Dock Area **SEE MAP ATTACHED** 03-12-2026 8:00 am 03-26-2026 4:00 pm Exterior painting To refresh paint around exterior areas of the building. Planned Rolando Mendez 301-405-2222
Atlantic Building - Northside Wing 3 & 4 Exterior Northside Wing 3 & 4 02-27-2026 10:00 am 02-28-2026 4:00 pm Exterior Power Washing to remove limestone on this area of the building and the retaining brick walls. Planned Rolando Mendez 301-852-1308
Urgent Outage: Reckord Armory, HVAC Heating Outage Basement ROTC Offices, *ONLY* 01-28-2026 12:40 pm HVAC Heating Outage Due to repairs needed on a damaged HVAC heating component. Emergency Gerald Young 301-405-2222
Road Closures
Location Area Start Finish Repair Type Repair Description Service Impact Type Contact Person Contact Phone

Purple Line: Campus-wide Periodic Sidewalk Closures Campus-wide Periodic Sidewalk Closures 03-09-2026 7:00 am 05-29-2026 4:00 pm Purple Line Construction Purple Line Construction Planned Casey Ferraro 301-405-9168
C. Daniel Mote, Jr., Engineering Laboratory Building - Northeast Entrance Door Closure Northeast Entrance Door Closure 02-18-2026 6:00 am 04-10-2026 6:00 pm Northeast Entrance Door Closure To support the Zupnik Hall Project to allow for installation of Bio-pond and new sidewalk Planned Daniel Klenner 240-882-5052
Exterior West - Van Munching Hall, Partial Sidewalk Closure Portion of sidewalk along Mowatt Lane. 01-29-2026 9:49 pm Partial Sidewalk Closure Repairing a leak on an underground heating hot water line that serves Van Munching Hall and the Architecture Building. Emergency Randolph Bayer 301-356-7812
Parking Lot #Z, Partial Parking Lot Closure Southeast corner of the parking lot. 12-22-2025 7:00 am 09-01-2028 4:00 pm Partial Parking Lot Closure To facilitate the construction laydown area for the Health and Human Sciences Complex project. Planned Randall Phillips 443-500-2356
Parking Lot #GG1 - Partial Parking Lot Closure, Sidewalk Closure East side of the A.V. Williams Building 08-01-2025 5:00 am 04-15-2026 5:00 pm Partial Parking Lot, Sidewalk Closure To install the new cooling tower north of the electric pad at the #GG1 parking lot. Planned Tim Zhao 240-383-2431
Elevator
Location Area Start Finish Repair Type Repair Description Service Impact Type Contact Person Contact Phone

Cumberland Hall, Elevator Modernization Elevator Car #2 02-03-2026 8:00 pm Elevator modernization Modernization of Elevator #2 Planned Chris O'Dea 301-405-2222
McKeldin Library Elevator Car #4 02-03-2026 8:00 am 04-30-2026 4:00 pm Elevator modernization Modernization of Elevator #4 Planned Chris O'Dea 301-405-2222
Stamp Student Union #163 Elevator Car #5 12-19-2025 12:15 pm Elevator modernization Modernization of Elevator #5 Planned Chris O'Dea 301-405-2222