Location Area Start Finish Repair Type Repair Description Service Impact Type Contact Person Contact Phone

Atlantic Building, Domestic Cold Water Outage Wing #4 of the Building. 11-20-2025 4:00 pm 11-20-2025 10:00 pm Domestic Cold Water Outage Replace the building's faulty domestic water meter and the isolation valves. Planned Jason Reardon 240-694-8431
Kim Engineering Building, Electrical Outage Corridors in wing #1 on the third floor of the building: #3193, #3190, #3188, and #3195. 11-17-2025 4:00 am 11-17-2025 6:00 am Electrical Outage To install a new 480V breaker for lab equipment in the building. Planned Joe Kselman 301-405-1992
William E. Kirwan Hall Electrical Outage Building 11-15-2025 6:00 am 11-15-2025 3:30 pm Electric Outage Preventative Mainteance Planned Randy Bayer Randy Bayer
Architecture Building Fire Alarm Testing/Suppression Work Entire Building 11-14-2025 6:00 am 11-14-2025 3:00 pm Fire Alarm/Suppression Testing and Inspection Fire alarm testing Planned Clarence Brown 3014050134
Architecture Building, Fire Alarm/Suppression Testing and Inspection Entire Building 11-14-2025 6:00 am 11-14-2025 3:00 pm Fire Alarm/Suppression Testing and Inspection Fire Alarm and Suppression Testing and Inspection Planned Clarence Brown 301-405-0134
Morrill Hall Fire Alarm Testing Building 11-13-2025 6:00 am 11-13-2025 3:00 pm Fire Alarm/Suppression Testing and Inspection Fire alarm testing Planned Clarence Brown 3014050134
Wye Oak Building Fire Alarm Testing Building 11-11-2025 6:00 am 11-11-2025 3:00 pm Fire Alarm/Suppression Testing and Inspection Fire alarm testing Planned Clarence Brown 3014050134
Glenn L. Martin Hall, C. Daniel Mote, Jr. Engineering Lab Building - Fire Alarm/Suppression Testing and Inspection Entire Building(s) 11-10-2025 6:00 am 11-11-2025 3:00 pm Fire Alarm and Suppression Testing and Inspection Fire Alarm and Suppression Testing and Inspection Planned Clarence Brown 301-405-0134
Tydings Hall , Fire Alarm/Suppression Testing and Inspection Entire Building 11-10-2025 6:00 am 11-10-2025 3:00 pm Fire Alarm/Suppression Testing and Inspection Fire Alarm and Suppression Testing and Inspection Planned Clarence Brown 301-405-0134
Architecture Building, Electrical Outage Wing #1, Classrooms 11-08-2025 6:00 am 11-08-2025 2:30 pm Electrical Outage To tie in circuits into electrical panels, as part of a project occurring in the building. Planned Paul Jackson 301-405-1903
Susquehanna Hall, Fire Alarm/Suppression Testing and Inspection Entire Building 11-07-2025 6:00 am 11-07-2025 3:00 pm Fire Alarm and Suppression Testing and Inspection Fire Alarm and Suppression Testing and Inspection Planned Clarence Brown 3014050134
Wind Tunnel Building, Exterior Painting North and south exterior areas of the building. 11-03-2025 8:00 am 11-15-2025 4:00 pm Exterior painting A contractor will prepare, prime, and paint some exterior windows, doors, and oxygen tanks as shown on the map. Planned Rolando Mendez 301-852-1308
Road Closures
Location Area Start Finish Repair Type Repair Description Service Impact Type Contact Person Contact Phone

Purple Line Construction Campus Drive & Regents Drive - Lane Closures 11-14-2025 8:30 am 11-14-2025 3:30 pm Purple Line Construction Purple Line Construction Planned Casey Ferraro 301-405-9168
Purple Line Construction Overnight Closures at Union Dr. & Alumni Dr. Intersection 11-12-2025 7:00 pm 11-14-2025 6:00 am Purple Line Construction Purple Line Construction Planned Casey Ferraro 301-405-9168
Purple Line Construction Baltimore Avenue between Hotel Drive and Fraternity Row 11-12-2025 9:00 am 11-14-2025 4:00 pm Purple Line Construction Purple Line Construction Planned Casey Ferraro 301-405-9168
Service Vehicle Parking Lot, West of DTP #2 Building - Parking Lot Closure, Sidewalk Closure West of the DTP #2 Building, on Preinkert Drive 11-12-2025 6:00 am 11-12-2025 6:00 pm Parking Lot Closure, Sidewalk Closure To lift and set in place a new cooling tower on the roof of the DTP #2 Building. Planned Elber Coreas 240-750-8850
Purple Line Construction, Campus Drive - Overnight Lane Closures Campus Drive between Rossborough Lane (near the Leonardtown Apartments) and the Metro parking garage. 11-10-2025 7:00 pm 11-15-2025 6:00 am Purple Line Construction Purple Line Construction Planned Casey Ferraro 301-405-9168
Edward St. John Learning and Teaching Center, Sidewalk Closure Exterior Northwest Corner of the Building 11-10-2025 7:00 am 11-21-2025 4:30 pm Sidewalk Closure To install a bike pad at the northwest corner of the building. Planned Frank Dudley 301-832-0943
Van Munching Hall, Sidewalk Closure Exterior West Courtyard Area. 11-10-2025 7:00 am 11-21-2025 4:30 pm Sidewalk Closure To install a bike pad in the west courtyard and a bike pad outside of the entrance to the western courtyard of the building. Planned Frank Dudley 301-832-0943
Centerville Hall Sidewalk Closure Exterior Sidewalk 11-10-2025 7:00 am 11-30-2025 5:00 pm Exterior Sidewalk Closure Concrete repair Planned Charles Patterson 3017895078
Purple Line Construction Overnight Closures for Overhead Wire Installation University Boulevard 11-05-2025 12:00 am 11-08-2025 5:00 am Purple Line Construction Purple Line Construction Planned Casey Ferraro 3014059168
Purple Line Construction Campus Drive - Overnight Lane Closures Campus Drive 11-03-2025 7:00 pm 11-08-2025 6:00 am Purple Line Construction Purple Line Construction Casey Ferraro 3014059168
Glenn L. Martin Hall, Sidewalk Closure Southeast entrance to the building. 11-03-2025 7:00 am 11-14-2025 5:00 pm Sidewalk Closure To repair and secure loose railings on the steps and surrounding areas at the southeast entrance. Planned Charles Patterson 301-789-5078
Animal Sciences Driveway Notifcation Driveway 11-03-2025 6:00 am 11-11-2025 2:30 pm Driveway Notificaiton Construction work Chrysanthe Broikos 3019566155
Purple Line Construction University Boulevard between Temple Street and Adelphi Road (near Graduate Hills Apartments) • Adelphi Road between Tulane Drive and University Boulevard (near Graduate Hills Apartments and UMGC) • Campus Drive between Adelphi Road and Presidential 11-01-2025 7:00 am 01-26-2026 12:00 pm Purple Line Construction Purple Line Construction Planned Casey Ferraro 301-405-9168
Industrial Lane - Parking Lot/Space Closure, Sidewalk Closure, Roadway Closure Industrial Lane, between ANSC #142 and Chem-Nuc #090 10-28-2025 6:00 am 12-12-2025 5:00 pm Sidewalk Closure, Roadway Closure, Parking Lot Closure, Parking Space Closure To install new underground condensate piping underneath Industrial Lane as part of the NextGen energy improvement projects. Planned Chrysanthe Broikos 301-956-6155
Purple Line Construction Rossborough Lane – Periodic Lane Closures Rossborough Lane 09-22-2025 7:00 am 12-22-2025 5:00 am Purple Line Purple Line Construction Planned Casey Ferraro 3014059168
Purple Line Construction Campus Drive Periodic Lane Closures – Core of Campus 09-15-2025 7:00 am 12-22-2025 5:00 pm Purple Line Construction Purple Line Construction Planned Casey Ferraro 301-405-9168
Fieldhouse Drive Sidewalk Closure Sidewalk Closure 08-18-2025 12:00 am 11-15-2025 12:00 am Exterior Sidewalk Closure Scub 3 Renovations Planned Al Neshati 3014054454
Parking Lot #GG1 - Partial Parking Lot Closure, Sidewalk Closure East side of the A.V. Williams Building 08-01-2025 5:00 am 04-15-2026 5:00 pm Partial Parking Lot, Sidewalk Closure To install the new cooling tower north of the electric pad at the #GG1 parking lot. Planned Tim Zhao 240-383-2431
Elevator
Location Area Start Finish Repair Type Repair Description Service Impact Type Contact Person Contact Phone

Centreville Hall #098 Elevator Car #4 09-05-2025 12:03 pm Elevator Repairs Modernization of Elevator #4 Planned Shane Kogok 301-405-2222
Prince Frederick Hall #425 Elevator Car #5 01-31-2025 2:37 pm Flood water damage Water flood damage Emergency Shane Kogok 443-758-7260