Denton Area Dining Hall - HVAC Steam Outage, HVAC Heating Hot Water Outage, Domestic Hot Water Outage Entire Building. 06-01-2026 6:00 am 06-01-2026 3:00 pm HVAC Steam Outage, HVAC Heating Hot Water Outage, Domestic Hot Water Outage To install a steam isolation valve so the building's HVAC condensate return unit can be replaced as part of the NextGen improvement project. Planned Chrysanthe Broikos 301-405-2222
Easton Hall - HVAC Steam Outage, HVAC Heating Hot Water Outage, Domestic Hot Water Outage Entire Building. 05-28-2026 6:00 am 05-29-2026 3:00 pm HVAC Steam Outage, HVAC Heating Hot Water Outage, Domestic Hot Water Outage To install a steam isolation valve so the building's HVAC condensate return unit can be replaced as part of the NextGen improvement project. Planned Chrysanthe Broikos 301-405-2222
Oakland Hall - HVAC Steam Outage, HVAC Heating Hot Water Outage, Domestic Hot Water Outage Entire Building. 05-27-2026 6:00 am 05-27-2026 3:00 pm HVAC Steam Outage, HVAC Heating Hot Water Outage, Domestic Hot Water Outage To install a steam isolation valve so the building's HVAC condensate return unit can be replaced as part of the NextGen improvement project. Planned Chrysanthe Broikos 301-405-2222
St. Mary's Hall, Fire Suppression/Sprinkler Outage Entire Building. 05-26-2026 8:00 am 08-07-2026 8:00 am Sprinkler/Suppression Outage To prevent accidentally activating the sprinkler heads/sprinkler system during HVAC renovation and ceiling work planned in the building. Planned Paul Jackson 301-405-2222
H.J. Patterson Hall - HVAC Steam Outage, HVAC Heating Hot Water Outage, Domestic Hot Water Outage Entire Building. 05-26-2026 8:00 am 05-26-2026 11:00 am HVAC Steam Outage, Domestic Hot Water Outage, HVAC Heating Hot Water Outage To repair a steam leak on a high-pressure steam pipe in mechanical room 0116B in H.J. Patterson Hall. Planned Horacio Torres 301-405-2222
Elkton Hall - HVAC Steam Outage, HVAC Heating Hot Water Outage, Domestic Hot Water Outage Entire Building. 05-26-2026 6:00 am 05-26-2026 3:00 pm HVAC Steam Outage, HVAC Heating Hot Water Outage, Domestic Hot Water Outage To install a steam isolation valve so the building's HVAC condensate return unit can be replaced as part of the NextGen improvement project. Planned Chrysanthe Broikos 301-405-2222
Chemistry Building, HVAC Chilled Water Outage Chemistry Building Wing 5 05-26-2026 6:00 am 05-27-2026 6:00 pm Chilled Water Outage To perform repairs on the Chemistry Building's chilled water heat exchanger Planned Randy Bayer 301-356-7812
Brendan Iribe Center, Fire Alarm Outage and Testing Fifth Floor - Fire Alarm Outage; Fire Alarm Testing Entire Building 05-18-2026 6:00 am 05-22-2026 3:00 pm Fire Alarm Outage, Fire Alarm Testing To replace the fifth-floor fire alarm devices in the building. Planned John Scali 301-405-2222
LeFrak Hall, Exterior Painting Exterior of the Building **SEE ATTACHED MAP** 05-14-2026 7:00 am 06-06-2026 4:00 pm Exterior painting Scraping, caulking, priming, and painting all of the window frames, doors, louvers, soffit, rails, and columns around the north, south, east, and west exterior areas of the building. Planned Rolando Mendez 301-405-2222
McKeldin Library, Lift Work, Sidewalk Closure North Exterior Side of Building *SEE MAP ATTACHED* 05-14-2026 6:00 am 05-22-2026 3:30 pm Lift Work, Sidewalk Closure To allow a contractor to set up a crane and perform lift work related to the building's ongoing chiller renewal project. Planned James Trythall 301-405-2222
Severn Building - Electrical Outage, Lighting Upgrade Work Entire Building. 05-11-2026 8:00 am 05-29-2026 4:00 pm Electrical Outage, Lighting Upgrades To perform lighting upgrades throughout the Severn Building **SEE ATTACHED SCHEDULE**. Planned Donald Rushing 301-405-2222
Road Closures
Location Area Start Finish Repair Type Repair Description Service Impact Type Contact Person Contact Phone

Fieldhouse Drive - Sidewalk Closure and Partial Roadway Closure; Parking Lot Z - Partial Parking Lot Closure Fieldhouse Drive between Alumni Drive and Jones-Hill House Loading Dock area, Fieldhouse Drive north sidewalk between Alumni Drive and Jones-Hill House Loading Dock area, Parking Lot Z Parking Spaces **SEE MAP ATTACHED** 05-26-2026 7:00 am 06-05-2026 4:00 pm Partial Roadway Closure, Partial Parking Lot Closure, Partial Sidewalk Closure To accommodate construction activities associated with the Health and Human Sciences Complex construction project. Planned Randall Phillips 301-405-2222
Paint Branch Drive - Partial Road Closure and Roadway Work Paint Branch Drive, between Campus Drive and Engineering Drive 05-26-2026 6:00 am 06-10-2026 6:00 pm Partial Parking Lot, Road, Sidewalk Closures accommodate roadwork related to concrete, curb, gutter, and roadway repaving of this section of Paint Branch Drive. Planned Daniel Klenner 240-882-5052
Purple Line: Campus-wide Overnight Testing Impacts Campus Drive between Preinkert Drive (near Anne Arundel Hall) and Union Drive (near the Benjamin Building. Connector road between Lot C1 and Lot L (Lot C1 exit). Rossborough Lane between Yale Avenue and Diamondback Drive 05-04-2026 10:00 pm 06-18-2026 6:00 am Purple Line Construction Purple Line Construction Planned Casey Ferraro 301-405-9168
Parking Lot U1 - Partial Parking Lot Closure and Excavation Southwest corner of South Campus Dining Hall -**SEE MAP ATTACHED** 05-04-2026 8:00 am 05-15-2026 8:00 pm Repair a condensate leak To locate and properly repair a leak in an HVAC condensate line. Planned Horacio Torres 301-955-6723
Purple Line: Campus-wide Periodic Sidewalk Closures Campus-wide Periodic Sidewalk Closures 03-09-2026 7:00 am 05-29-2026 4:00 pm Purple Line Construction Purple Line Construction Planned Casey Ferraro 301-405-9168
Parking Lot #Z, Partial Parking Lot Closure Southeast corner of the parking lot. 12-22-2025 7:00 am 09-01-2028 4:00 pm Partial Parking Lot Closure To facilitate the construction laydown area for the Health and Human Sciences Complex project. Planned Randall Phillips 443-500-2356
Elevator
Location Area Start Finish Repair Type Repair Description Service Impact Type Contact Person Contact Phone

Ellicott Hall - Elevator 3, Elevator Modernization Elevator 3 04-09-2026 7:00 am 07-13-2026 11:59 pm Elevator modernization This is a planned modernization upgrade of the elevator. Planned Chris O'Dea 301-405-2222
Centreville Hall - Elevator 3, Elevator Modernization Elevator 3 02-16-2026 1:52 pm Elevator modernization For a planned modernization upgrade of the elevator. Planned Chris O'Dea 301-405-2222
Cumberland Hall, Elevator Modernization Elevator Car #2 02-03-2026 8:00 pm Elevator modernization Modernization of Elevator #2 Planned Chris O'Dea 301-405-2222