Location Area Start Finish Repair Type Repair Description Service Impact Type Contact Person Contact Phone

Riggs Alumni - Brick Work South side of building 06-23-2025 8:00 am 06-27-2025 3:00 pm Paver Repair Paver repair Planned William Butler x58882
Van Munching Hall - Fire Alarm/Suppression Outage Wing 4 06-23-2025 7:00 am 07-03-2025 5:00 am Painting columns Painting columns on the 4th floor Planned Ben Davis 301-395-6104
Rabin Technology Advancement Program - Electrical Outage Whole Building 06-21-2025 6:00 am 06-21-2025 6:30 pm Replace ATS Replace ATS Planned Wayne Henson 240-882-8759
Martin Hall & Mote Engineering Lab - Skywalk Caulking Skywalkway 06-19-2025 6:00 am 06-19-2025 3:00 pm Skywalk Repair Skywalk caulking Planned Colin Davis 301-458-1741
Route 1 at Hotel Drive - Roadway Impact Route 1 at Hotel Drive 06-18-2025 12:00 am 06-19-2025 4:00 pm Delivery of equipment Delivery of Boilers for CPE Planned Randall Phillips 443-500-2356
Memorial Chapel - Exterior Painting Eastside outside of Chapel 06-16-2025 8:00 am 06-26-2025 4:00 pm Exterior painting Exterior painting Planned Rolando Mendez 301-852-1308
Brendan Iribe Center, Window Repair Work Entire Exterior of Building 06-16-2025 7:00 am 07-07-2025 2:00 pm Glass window repair Provide window replacements for broken glass in various locations around the building.. **WORK TO OCCUR DAILY, DURING WEEK ONLY** Planned Andrew Pucci 301-873-8008
Sidewalk Closure: Between Microbiology & Nyumburu Sidewalk Eastside of Microbiology & Westside of Nyumburu 06-11-2025 7:00 am 06-20-2025 5:00 pm Exterior Sidewalk Closure Sidewalk Planned Charles Patterson 301-789-5078
Landscape Utilization Study Sidewalk Closure McKeldin Mall McKeldin Mall Sidewalk 06-10-2025 7:00 am 06-24-2025 7:00 am Utilization Study Utilization Study Planned Scott Rupert 301-887-7414
CD Mote Engineering Lab - Bathroom Closure Men's 1182 & Women's 1182A 06-09-2025 6:00 am 07-05-2025 4:00 pm Renovations Renovations Planned Sanmi Fajemisin 240-749-3868
Fieldhouse Dr Partial Sidewalk Closure Fieldhouse Dr 05-27-2025 6:00 am 08-17-2025 8:00 pm install new underground hydraulic piping for The Clarice Smith Performing Arts Center and The Riggs Alumni Center. Planned Al Neshati 301-405-4454
Road Closures
Location Area Start Finish Repair Type Repair Description Service Impact Type Contact Person Contact Phone

Mckledin Mall Sidewalk CLosure Mckeldin Mall 06-23-2025 6:00 am 07-07-2025 4:00 pm Crosswalk and Partial Sidewalk Closure Lighting Upgrade Unplanned Ken Jester 4437166905
Riggs Intersection - Road and sidewalk closure East End of Riggs Intersection 06-16-2025 6:00 am 06-30-2025 4:00 pm 8" pipe install Pipe install Planned Randall Phillips 443-500-2356
North Championship Lane Area Riggs Intersection, Parking Lot #Z 05-27-2025 7:00 am 06-20-2025 4:00 pm Partial Parking Lot, Road, Sidewalk Closures To install a new 8" waterline across the Riggs Intersection. Planned Randall Phillips 443 500 2356
Elevator
Location Area Start Finish Repair Type Repair Description Service Impact Type Contact Person Contact Phone

Centreville - Elevator #3 Outage Elevator #3 06-04-2025 3:00 pm Elevator Elevator Unplanned Cordero Pracht x52222
Chemistry Building - Elevator #5 Elevator #3 Freight 05-22-2025 10:00 am Elevator Elevator Unplanned Shane Kogok 5-7079
Prince Frederick Hall Elevator Car #5 Car #5 01-31-2025 2:37 pm Flood water damage Water flood damage Emergency Shane Kogok 443-758-7260
Centreville Hall Elevator #2 10-02-2024 9:00 am Elevator modernization Modernization of Elevator #2 Unplanned Shane Kogok 443-758-7260