Location Area Start Finish Repair Type Repair Description Type Contact Person Contact Phone Attachments
(142) Animal Sciences Building Building 04-04-2022 6:00 am 07-11-2022 2:00 pm Elevator Outage Equipment surveys and repairs Planned Martin Culp 301-643-3267
(142) Animal Sciences Building Elevator #1 (all floors and machine room penthouse) 04-04-2022 1:16 am 07-11-2022 2:00 pm Elevator Outage Elevator project Planned Martin Cilp 301-643-3267
(039) Van Munching Hall Elevator #3 08-20-2021 2:00 pm Water in the overhead Shane Kogok 301-405-7074
(115) AV Williams Elevator #1 08-06-2021 12:35 pm Jack Jack Unplanned Shane Kogok 443-758-7260
Service Outages & Impacts
Location Area Start Finish Repair Type Repair Description Type Contact Person Contact Phone Attachments
(096) Cambridge Hall Building 01-11-2022 8:00 am 01-11-2022 6:00 pm Electrical Ouage Performing EDS maintenance Planned Avi Bhogal 301-852-1163
(034) Jimenez Hall Wing 1 01-03-2022 6:00 am 01-07-2022 3:00 pm Steam/Utility Outage Replacing steam domestic hot water heater exchanger with electric domestic hot water heater Planned Zachary Eide 301-310-5323
(134) Fraternity House 9 Manhole 415 in grass area behind Frat House 9 (Building 134) 12-14-2021 6:00 am 12-20-2021 8:00 pm Manhole maintenance Replacing the lid of Manhole 415 with a Fibrelite lid Planned Avninder Bhogal 301-852-1163
(067) SCUB II- Parking Lot A Manhole 131- behind SCUB II 12-08-2021 6:00 am 12-16-2021 8:00 pm Manhole maintenance Replacing the lid of Manhole 131 with a Fibrelite lid Planned Avninder Bhogal 301-852-1163
(225) Kim Engineering Building Building 12-04-2021 6:00 am 12-05-2021 6:00 pm Chemistry Wing 1 Project All normal power will be off, unless on emergency power. Planned Dan Klenner 240-882-5052
(091) Chemistry Wing 3 12-04-2021 6:00 am 12-05-2021 6:00 pm Chemistry Wing 1 Project All normal power will be off, unless on emergency power. Planned Dan Klenner 240-882-5052
(432) Brendan Iribe Center Building 12-04-2021 6:00 am 12-05-2021 6:00 pm Chemistry Wing 1 Project All normal power will be off, unless on emergency power. Planned Dan Klenner 240-882-5052
(091) Chemistry Wing 5 12-04-2021 6:00 am 12-05-2021 6:00 pm Chemistry Wing 1 Project All normal power will be off, unless on emergency power. Planned Dan Klenner 240-882-5052
(090) Chemical Nuclear Engineering Building Building 12-04-2021 6:00 am 12-05-2021 6:00 pm Chemistry Wing 1 Project Normal power off unless on emergency power. Planned Dan Klenner 240-882-5052
(141) Tawes Room 0217 & 0217A 12-03-2021 6:30 am 12-03-2021 7:30 am To terminate new circuits into emergency power panel. Security panels in room 0217A & Telecom Rack in room 0217. Planned Miguel Flores 301-789-8197
(405) SCUB 4 Building 12-01-2021 8:00 am 12-01-2021 8:00 pm Install temp transformer to allow repairs to existing transformer that's leaking oil. Normal power off to the office areas unless on emergency power. Planned Dan Klenner 240-882-5052
(223) Energy Research Building Parking lot GG1 12-01-2021 8:00 am 12-10-2021 8:00 pm Manhole maintenance Replacing the lid of Manhole 319 with a Fibrelite lid Planned Avninder Bhogal 301-852-1163
(432) Brendan Iribe Center Cooling Towers 12-01-2021 8:00 am 12-01-2021 8:00 pm Install temp transformer to allow repairs to existing transformer that's leaking oil No power to the cooling towers, will impact the heat Planned Dan Klenner 240-882-5052
(054) Preinkert Hall 2102 11-29-2021 6:00 am 12-03-2021 4:00 pm Floor Installation Loud noises and odors. Planned John Smith 301-832-7284
(048) Francis Scott Key Hall Building 11-29-2021 6:00 am 11-30-2021 3:00 pm Fire Alarm Suppression Inspection Inspecting the safety and function of the fire control and suppression system Planned Clarence L. Brown 202-391-6110
(043) Taliaferro Hall Building 11-29-2021 6:00 am 11-30-2021 3:00 pm Fire Alarm Suppression Inspection Inspecting the safety and function of the fire control and suppression system Planned Clarence L. Brown 202-391-6110
(047) Woods Hall Walkways/Sidewalks on exterior of building 11-22-2021 8:00 am 12-06-2021 4:30 pm Sidewalk Repairs Repairing damaged sections of sidewalk Planned Frank Dudley 301-832-0943
(382) Neutral Buoyancy Research Facility Building 11-16-2021 6:00 am 12-03-2021 3:00 pm Replacing HV Unit No heat to the building, supplemental heaters will be supplied. Planned Zach Eide (301) 335-3615
(073) H.J. Patterson Exterior of the Building 11-08-2021 8:00 am 12-13-2021 5:00 pm Exterior painting Planned Rolando Mendez 301-405-2239
(226) Edward St. John Learning & Teaching Center Sidewalk of Edward St John Learning and Teaching Center along Campus Drive 11-02-2021 6:00 am 12-31-2021 5:00 pm Sidewalk Replacement Replacing sidewalk to prevent water intrusion into building Planned Lutreavis Damon Phillips 202-716-0444
Road Closures
Location Area Start Finish Repair Type Repair Description Type Contact Person Contact Phone Attachments
(087) Central Animal Resources Facility Roadway- Intersection of Engineering Drive and CARF Driveway 12-27-2021 6:00 am 01-31-2022 6:00 pm Roadway & Sidewalk Closure Replacing underground steam and condensate vault- MH-322 Planned Avninder Bhogal 301-852-1163
(087) Central Animal Resources Facility Roadway- Intersection of Engineering Drive and CARF Driveway 12-27-2021 6:00 am 01-31-2022 6:00 pm Road Closure Replacing underground steam and condensate vault- MH-322 Planned Avninder Bhogal 301-852-1163
Fieldhouse Drive Bob "Turtle" Smith Stadium at Shipley and Stamp Student Union 12-06-2021 7:00 am 12-10-2021 5:00 pm Partial Road Closure Planned Anthony Brown 240-508-4816
Presidential Drive At the Sand Filter/ Peace Garden 11-29-2021 6:00 am 12-07-2021 4:00 pm Road Closure Replacement of the storm drain and manhole 3 Planned Sandra Williams 919-538-3121
Union Drive Union Drive between Lot 1 and Z 10-11-2021 7:00 am 12-03-2021 5:00 pm Purple Line Construction Purple Line work Planned Christopher Ho 301-405-9969